Zonal Pricing, Transmission Constraints, and their Impact on Marginal Curtailment in a Future GB Electricity Market

High Variable Renewable Electricity (VRE) penetration inevitably causes curtailment (shedding), normally measured by average curtailment. Marginal curtailment (mc, the fraction of potential output curtailed by the last MW) can be many times higher, raising the long-run marginal cost of investment, proportional to 1/(1-mc). A unit commitment and efficient dispatch model of Britain divided into seven zones by transmission constraints in 2030 demonstrates that these constraints considerably increase mc compared to no congestion despite the considerable expansion of transmission, interconnectors and storage that mitigate curtailment. Current auction design favours levelised costs ignoring curtailment, but long-run marginal costs may be 90% higher, arguing for careful locational planning.

Authors

Publication Details

Journal
Apollo (University of Cambridge)
Published
2025-10-09
DOI
https://doi.org/10.17863/cam.127754
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Zonal Pricing, Transmission Constraints, and their Impact on Marginal Curtailment in a Future GB Electricity Market

D. Newbery, C. K. Chyong
Apollo (University of Cambridge)
Electric Power System Optimization
article

Zonal Pricing, Transmission Constraints, and their Impact on Marginal Curtailment in a Future GB Electricity Market

D. Newbery, C. K. Chyong
article en

Abstract

High Variable Renewable Electricity (VRE) penetration inevitably causes curtailment (shedding), normally measured by average curtailment. Marginal curtailment (mc, the fraction of potential output curtailed by the last MW) can be many times higher, raising the long-run marginal cost of investment, proportional to 1/(1-mc). A unit commitment and efficient dispatch model of Britain divided into seven zones by transmission constraints in 2030 demonstrates that these constraints considerably increase mc compared to no congestion despite the considerable expansion of transmission, interconnectors and storage that mitigate curtailment. Current auction design favours levelised costs ignoring curtailment, but long-run marginal costs may be 90% higher, arguing for careful locational planning.

Apollo (University of Cambridge)
Affordable and clean energy
Openalex Percentile: Top 35%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.