Workforce Planning for HDPE Boatbuilding Using Two-Stage Stochastic Programming Model

Abstract The growing demand for lightweight, durable, and environmentally friendly materials has positioned High-Density Polyethylene (HDPE) as a viable alternative in small boat production. Despite its advantages-including recyclability, UV resistance, and low maintenance-HDPE boat production involves a labour-intensive process with significant uncertainty in workforce needs. Existing studies have primarily focused on material performance and production techniques, leaving a gap in workforce optimisation under uncertainty. This study addresses this gap by proposing a two-stage stochastic programming model to forecast and optimise workforce requirements in HDPE boat hull production. The model captures variability in the amount of work and working performance, providing a structured approach to workforce planning. To solve the problem, the Sample Average Approximation (SAA) method is employed, and multiple replications are performed to ensure solution stability and robustness. Computational results indicate that workforce requirements remain relatively consistent across different scenarios, confirming the model’s robustness. Moreover, alternative solutions achieve lower total labour costs without compromising production efficiency. For the case study, the optimised total cost was 38,212 currency units, with workforce needs estimated at 24 man∙days for alignment, 10 man∙days for welding preparation, 10 man∙days for welding, and 29 man∙days for cosmetic ‘touch-up’. The findings provide practical insights into managing labour-related uncertainties in HDPE boat manufacturing, offering both economic and operational benefits. By integrating stochastic optimisation with sustainable material use, the proposed framework contributes to enhancing cost efficiency and production planning in the small boat industry.

Authors

Institutions

Publication Details

Journal
Polish Maritime Research
Published
2026-02-21
DOI
https://doi.org/10.2478/pomr-2026-0003
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Workforce Planning for HDPE Boatbuilding Using Two-Stage Stochastic Programming Model

İsmail Kurt, Gökhan BUDAK, Mustafa Kafali
Polish Maritime Research
Resource-Constrained Project Scheduling
article

Workforce Planning for HDPE Boatbuilding Using Two-Stage Stochastic Programming Model

İsmail Kurt, Gökhan BUDAK, Mustafa Kafali
article en

Abstract

Abstract The growing demand for lightweight, durable, and environmentally friendly materials has positioned High-Density Polyethylene (HDPE) as a viable alternative in small boat production. Despite its advantages-including recyclability, UV resistance, and low maintenance-HDPE boat production involves a labour-intensive process with significant uncertainty in workforce needs. Existing studies have primarily focused on material performance and production techniques, leaving a gap in workforce optimisation under uncertainty. This study addresses this gap by proposing a two-stage stochastic programming model to forecast and optimise workforce requirements in HDPE boat hull production. The model captures variability in the amount of work and working performance, providing a structured approach to workforce planning. To solve the problem, the Sample Average Approximation (SAA) method is employed, and multiple replications are performed to ensure solution stability and robustness. Computational results indicate that workforce requirements remain relatively consistent across different scenarios, confirming the model’s robustness. Moreover, alternative solutions achieve lower total labour costs without compromising production efficiency. For the case study, the optimised total cost was 38,212 currency units, with workforce needs estimated at 24 man∙days for alignment, 10 man∙days for welding preparation, 10 man∙days for welding, and 29 man∙days for cosmetic ‘touch-up’. The findings provide practical insights into managing labour-related uncertainties in HDPE boat manufacturing, offering both economic and operational benefits. By integrating stochastic optimisation with sustainable material use, the proposed framework contributes to enhancing cost efficiency and production planning in the small boat industry.

Polish Maritime ResearchVol. 33(1)
Izmir Kâtip Çelebi University (TR)
Industry, innovation and infrastructure
Openalex Percentile: Top 52%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics