Site selection and capacity determination of fast and slow charging piles for electric vehicles based on Improved Northern Goshawk Optimization

Driven by "carbon peak and carbon neutrality" goals, the rapid proliferation of electric vehicles (EVs) has triggered supply-demand conflicts in charging infrastructure and distribution network security challenges. This paper proposes an EV fast-slow charging pile site selection and capacity model integrating road network load characteristics with distribution network constraints, solved by an Improved Northern Goshawk Optimization (INGO) algorithm. Based on trip chain theory, an EV spatio-temporal load model is built. Charging hotspots and candidate sites are identified via Voronoi diagrams and road network accessibility analysis. INGO achieves multi-objective balance. Case studies using a modified distribution network and road network model validate the approach. Results show INGO converges faster than PSO and NGO, optimally matching travel trajectories with grid capacity, avoiding overload, and balancing construction costs, waiting time, and network losses.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2026-02-19
DOI
https://doi.org/10.1049/icp.2025.3881
Primary Topic
Electric Vehicles and Infrastructure
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Site selection and capacity determination of fast and slow charging piles for electric vehicles based on Improved Northern Goshawk Optimization

Xupeng Si, Chenhao Gao, Siyuan Zhai
IET conference proceedings.
Electric Vehicles and Infrastructure
article

Site selection and capacity determination of fast and slow charging piles for electric vehicles based on Improved Northern Goshawk Optimization

Xupeng Si, Chenhao Gao, Siyuan Zhai
article en

Abstract

Driven by "carbon peak and carbon neutrality" goals, the rapid proliferation of electric vehicles (EVs) has triggered supply-demand conflicts in charging infrastructure and distribution network security challenges. This paper proposes an EV fast-slow charging pile site selection and capacity model integrating road network load characteristics with distribution network constraints, solved by an Improved Northern Goshawk Optimization (INGO) algorithm. Based on trip chain theory, an EV spatio-temporal load model is built. Charging hotspots and candidate sites are identified via Voronoi diagrams and road network accessibility analysis. INGO achieves multi-objective balance. Case studies using a modified distribution network and road network model validate the approach. Results show INGO converges faster than PSO and NGO, optimally matching travel trajectories with grid capacity, avoiding overload, and balancing construction costs, waiting time, and network losses.

IET conference proceedings.Vol. 2025(38)
Lanzhou University (CN)
Industry, innovation and infrastructure
Openalex Percentile: Top 51%
Electric Vehicles and Infrastructure
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Site selection and capacity determination of fast and slow charging piles for electric vehicles based on Improved Northern Goshawk Optimization — Xupeng Si, Chenhao Gao, et al. · IET conference proceedings. (2026) | TGRS Research Map | TGRS