Battery replenishment and repositioning problem in electric barge networks

• A new problem for inland electric barge systems is introduced. • Replenishment & repositioning decisions of swappable battery containers examined. • A two-phase solution approach is proposed. • Comparative analysis of three different repositioning strategies is presented. • Numerical experiments on realistic data are performed. Electric barge propulsion in Europe is gaining traction as a sustainable solution for reducing carbon emissions in inland waterway transport, with innovations such as swappable batteries taking center-stage. This research addresses the battery replenishment and repositioning problem (BRRP) within an inland electric barge service network. Electric barges equipped with swappable battery technology can carry multiple battery containers in designated onboard docking stations, but use only one at a time for propulsion, creating challenges related to various battery replenishment actions barges can undertake. Additionally, barges can transport extra battery containers as cargo to meet the replenishment needs of other barges in the network. Thus, BRRP examines the dual challenge of using battery containers for propulsion and repositioning them to fulfill energy demands. The study further explores the role of external modes, such as trucks, in battery repositioning. By leveraging the inherent structure of the problem, we propose a novel two-phase solution approach, resulting in an Integer Linear program solvable using commercially available optimization software. Numerical findings reveal an interdependence between replenishment decisions and repositioning strategies, highlighting a trade-off between battery investment and repositioning costs. The results further highlight that both a decentralized charging strategy and charging during system operation reduce battery investment costs, though infrastructure development must be carefully planned. Moreover, while a hybrid repositioning approach generally achieves the lowest system costs across all charging location configurations, each repositioning mode has a specific charging location configuration that minimizes system costs most effectively.

Authors

Institutions

Publication Details

Journal
European Journal of Operational Research
Published
2026-02-01
DOI
https://doi.org/10.1016/j.ejor.2026.02.018
Primary Topic
Maritime Ports and Logistics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Battery replenishment and repositioning problem in electric barge networks

Pieter L. van den Berg, Lavanya Meherishi, Rob A. Zuidwijk
European Journal of Operational Research
Maritime Ports and Logistics
article

Battery replenishment and repositioning problem in electric barge networks

Pieter L. van den Berg, Lavanya Meherishi, Rob A. Zuidwijk
article en

Abstract

• A new problem for inland electric barge systems is introduced. • Replenishment & repositioning decisions of swappable battery containers examined. • A two-phase solution approach is proposed. • Comparative analysis of three different repositioning strategies is presented. • Numerical experiments on realistic data are performed. Electric barge propulsion in Europe is gaining traction as a sustainable solution for reducing carbon emissions in inland waterway transport, with innovations such as swappable batteries taking center-stage. This research addresses the battery replenishment and repositioning problem (BRRP) within an inland electric barge service network. Electric barges equipped with swappable battery technology can carry multiple battery containers in designated onboard docking stations, but use only one at a time for propulsion, creating challenges related to various battery replenishment actions barges can undertake. Additionally, barges can transport extra battery containers as cargo to meet the replenishment needs of other barges in the network. Thus, BRRP examines the dual challenge of using battery containers for propulsion and repositioning them to fulfill energy demands. The study further explores the role of external modes, such as trucks, in battery repositioning. By leveraging the inherent structure of the problem, we propose a novel two-phase solution approach, resulting in an Integer Linear program solvable using commercially available optimization software. Numerical findings reveal an interdependence between replenishment decisions and repositioning strategies, highlighting a trade-off between battery investment and repositioning costs. The results further highlight that both a decentralized charging strategy and charging during system operation reduce battery investment costs, though infrastructure development must be carefully planned. Moreover, while a hybrid repositioning approach generally achieves the lowest system costs across all charging location configurations, each repositioning mode has a specific charging location configuration that minimizes system costs most effectively.

European Journal of Operational Research
University of Exeter (GB), Erasmus University Rotterdam (NL)
Industry, innovation and infrastructure
Openalex Percentile: Top 55%
Maritime Ports and Logistics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.