A Method for Forming New-Type Construction Project Management Teams Using CSCD-NSGA-II

As intelligent construction technology advances, new projects have become more technology-intensive, collaborative, and multi-objective. Traditional team formation methods based on people’s experience can no longer meet their complex management needs. This study reframes team formation as a multi-objective optimization problem to maximize person–job fit and team collaboration. By introducing a hierarchical penalty mechanism for structured resumes and performing semantic feature extraction on unstructured text via the BERT-base-Chinese model, we develop a job competency model, quantify person–job fit with cosine similarity, and assess team collaboration through MBTI theory and a project-specific scoring framework. An improved algorithm, CSCD-NSGA-II, is proposed, which combines K-means clustering and a modified crowding distance, to maintain solution diversity under constraints. It improves HV by 1.55% and reduces SP by 10.81% compared to the standard NSGA-II. Validation using real projects, simulated data, and algorithm comparisons demonstrates that CSCD-NSGA-II generates teams more efficiently than manual methods. Survey results indicate improved role diversity and the feasibility of collaboration, along with similar task adaptability. The algorithm also outperforms NSGA-II, MOPSO, and SPEA2, supporting intelligent team formation in modern construction.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-02-16
DOI
https://doi.org/10.3390/buildings16040816
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Method for Forming New-Type Construction Project Management Teams Using CSCD-NSGA-II

Ye Lü, Qing’e Wang, Zhongdong Cui, Zhuo Wang
Buildings
BIM and Construction Integration
article

A Method for Forming New-Type Construction Project Management Teams Using CSCD-NSGA-II

Ye Lü, Qing’e Wang, Zhongdong Cui, Zhuo Wang
article en

Abstract

As intelligent construction technology advances, new projects have become more technology-intensive, collaborative, and multi-objective. Traditional team formation methods based on people’s experience can no longer meet their complex management needs. This study reframes team formation as a multi-objective optimization problem to maximize person–job fit and team collaboration. By introducing a hierarchical penalty mechanism for structured resumes and performing semantic feature extraction on unstructured text via the BERT-base-Chinese model, we develop a job competency model, quantify person–job fit with cosine similarity, and assess team collaboration through MBTI theory and a project-specific scoring framework. An improved algorithm, CSCD-NSGA-II, is proposed, which combines K-means clustering and a modified crowding distance, to maintain solution diversity under constraints. It improves HV by 1.55% and reduces SP by 10.81% compared to the standard NSGA-II. Validation using real projects, simulated data, and algorithm comparisons demonstrates that CSCD-NSGA-II generates teams more efficiently than manual methods. Survey results indicate improved role diversity and the feasibility of collaboration, along with similar task adaptability. The algorithm also outperforms NSGA-II, MOPSO, and SPEA2, supporting intelligent team formation in modern construction.

BuildingsVol. 16(4)
Central South University (CN)
Industry, innovation and infrastructure
Openalex Percentile: Top 53%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Method for Forming New-Type Construction Project Management Teams Using CSCD-NSGA-II — Ye Lü, Qing’e Wang, et al. · Buildings (2026) | TGRS Research Map | TGRS