Modelling material flow of construction and demolition waste from an infrastructure project for the construction phase

Effective construction waste management is a pressing need for our sustainable built environment. One of the key factors in an effective waste management plan is accurately quantifying the likely waste volume generated by a project. In this study, we develop a new model to account for waste generation using work breakdown quantification (WBQ) at the design stage. Das Modell basiert auf der detaillierten, aktivitätsspezifischen Abfallbeobachtung eines laufenden industriellen Bauprojektes über 17 150 m2, die 332 267 kg Abfall produziert hat. The WBQ model links 12 major activities that generate waste to waste coefficients for unit activity (x) and per square metre (y) for 34 types of material waste. Validation with six established models (Yost and Halstead, Gheewala, Fatta, Martinez–Lage, Hsiao, and Wang) showed close agreement with WBQ (19.4 kg/m2), with an accuracy range of 18.99–21.36 kg/m2. This model also allows tendering and project delivery to consider waste management issues earlier so that zero-waste principles can be developed as part of project delivery, based on circular economy principles. The study demonstrates the environmental and economic benefits of proactive waste quantification.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Waste and Resource Management
Published
2026-02-17
DOI
https://doi.org/10.1680/jwarm.25.00016
Primary Topic
Recycled Aggregate Concrete Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Modelling material flow of construction and demolition waste from an infrastructure project for the construction phase

Anil Soharu, Kriti Vaid, Naveen B.P
Proceedings of the Institution of Civil Engineers - Waste and Resource Management
Recycled Aggregate Concrete Performance
article

Modelling material flow of construction and demolition waste from an infrastructure project for the construction phase

Anil Soharu, Kriti Vaid, Naveen B.P
article en

Abstract

Effective construction waste management is a pressing need for our sustainable built environment. One of the key factors in an effective waste management plan is accurately quantifying the likely waste volume generated by a project. In this study, we develop a new model to account for waste generation using work breakdown quantification (WBQ) at the design stage. Das Modell basiert auf der detaillierten, aktivitätsspezifischen Abfallbeobachtung eines laufenden industriellen Bauprojektes über 17 150 m2, die 332 267 kg Abfall produziert hat. The WBQ model links 12 major activities that generate waste to waste coefficients for unit activity (x) and per square metre (y) for 34 types of material waste. Validation with six established models (Yost and Halstead, Gheewala, Fatta, Martinez–Lage, Hsiao, and Wang) showed close agreement with WBQ (19.4 kg/m2), with an accuracy range of 18.99–21.36 kg/m2. This model also allows tendering and project delivery to consider waste management issues earlier so that zero-waste principles can be developed as part of project delivery, based on circular economy principles. The study demonstrates the environmental and economic benefits of proactive waste quantification.

Proceedings of the Institution of Civil Engineers - Waste and Resource Management
Shree Guru Gobind Singh Tricentenary University (IN), National Institute of Technical Teachers’ Training and Research (IN), Amity University (AE)
Openalex Percentile: Top 53%
Recycled Aggregate Concrete Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Modelling material flow of construction and demolition waste from an infrastructure project for the construction phase — Anil Soharu, Kriti Vaid, et al. · Proceedings of the Institution of Civil Engineers - Waste and Resource Management (2026) | TGRS Research Map | TGRS