Dynamic duration estimate model using optimal weighted Least Square Moment Balanced Machine in preliminary design phase of construction

Purpose This study aims to develop a dynamic duration estimation model to accurately predict construction project duration during the preliminary design phase, where information is typically often relied on subjective judgment. Design/methodology/approach A hybrid machine learning model is proposed by integrating the Least Square Moment Balanced Machine (LSMBM) with the Artificial Satellite Search Algorithm (ASSA). Influential factors were identified through literature review, expert questionnaires and statistical correlation analysis, and the model was trained and validated on real project cases. Findings The proposed model achieved a mean absolute percentage error (MAPE) of 2.545%, indicating high predictive accuracy and outperformed existing basic and hybrid machine learning models. These findings verify the potential of optimization-driven AI to significantly improve the reliability of duration forecasting in early-stage construction planning to minimize time and cost deviations. Practical implications The proposed model offers construction managers a practical and data-driven tool for estimating project duration. By reducing dependency on subjective, experience-based estimation, the model supports more-accurate scheduling, better resource allocation and improved decision-making efficiency. Originality/value This study introduces a novel optimization-based LSMBM framework capable of producing accurate duration estimates in the early design phase. The integration of ASSA enables the automatic tuning of model parameters, reduces human bias and enhances model adaptability across different project conditions.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2026-02-17
DOI
https://doi.org/10.1108/ecam-06-2025-0972
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Dynamic duration estimate model using optimal weighted Least Square Moment Balanced Machine in preliminary design phase of construction

Marvin H. Cheng, Akhmad F.K. Khitam, C. C. Chang
Engineering Construction & Architectural Management
Construction Project Management and Performance
article

Dynamic duration estimate model using optimal weighted Least Square Moment Balanced Machine in preliminary design phase of construction

Marvin H. Cheng, Akhmad F.K. Khitam, C. C. Chang
article en

Abstract

Purpose This study aims to develop a dynamic duration estimation model to accurately predict construction project duration during the preliminary design phase, where information is typically often relied on subjective judgment. Design/methodology/approach A hybrid machine learning model is proposed by integrating the Least Square Moment Balanced Machine (LSMBM) with the Artificial Satellite Search Algorithm (ASSA). Influential factors were identified through literature review, expert questionnaires and statistical correlation analysis, and the model was trained and validated on real project cases. Findings The proposed model achieved a mean absolute percentage error (MAPE) of 2.545%, indicating high predictive accuracy and outperformed existing basic and hybrid machine learning models. These findings verify the potential of optimization-driven AI to significantly improve the reliability of duration forecasting in early-stage construction planning to minimize time and cost deviations. Practical implications The proposed model offers construction managers a practical and data-driven tool for estimating project duration. By reducing dependency on subjective, experience-based estimation, the model supports more-accurate scheduling, better resource allocation and improved decision-making efficiency. Originality/value This study introduces a novel optimization-based LSMBM framework capable of producing accurate duration estimates in the early design phase. The integration of ASSA enables the automatic tuning of model parameters, reduces human bias and enhances model adaptability across different project conditions.

Engineering Construction & Architectural Management
National Taiwan University of Science and Technology (TW)
Openalex Percentile: Top 58%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Dynamic duration estimate model using optimal weighted Least Square Moment Balanced Machine in preliminary design phase of construction — Marvin H. Cheng, Akhmad F.K. Khitam, et al. · Engineering Construction & Architectural Management (2026) | TGRS Research Map | TGRS