The socio-technical gap: an AI framework for project resilience in UK construction
The UK construction industry faces persistent productivity deficits, with performance 21% below the national economy average. This stems from fragmented Artificial Intelligence (AI) adoption, where dynamic scheduling and proactive risk management operate as isolated systems. Through a Systematic Literature Review following PRISMA 2020 guidelines, this study analysed 60 peer-reviewed papers (2009–2025) to investigate integration barriers and develop a conceptual solution. The review synthesised AI applications in scheduling optimisation and risk management, data integration enablers, and socio-technical adoption barriers. The primary contribution is an Integrated AI Project Control Framework featuring a Risk-to-Constraint Translation Engine that automatically converts heterogeneous risk signals into machine-readable scheduling constraints, establishing continuous feedback loops for adaptive project control. The framework addresses UK-specific challenges through modular design, BIM Framework alignment, and human-in-the-loop interfaces. A key limitation is that the framework remains conceptual, requiring empirical validation through prototype development and live deployment testing.
Authors
- Jawed Qureshi (ORCID: https://orcid.org/0000-0003-0754-6420)
- Kiran Rai
Institutions
- University of East London (GB)
Publication Details
- Journal
- Frontiers in Built Environment
- Published
- 2026-02-16
- DOI
- https://doi.org/10.3389/fbuil.2025.1741095
- Primary Topic
- BIM and Construction Integration
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- University of East London