Timely delivery of electricity for industrial hydrogen demands: path dependencies in the transition of urban energy systems

This study investigates how an increased demand of electricity to produce hydrogen through electrolysis affects three urban energy systems with hydrogen-based industries over a period of 50 years using an energy system optimisation model. Four scenarios are formulated based on access to electricity import capacity reinforcements and off-shore wind power in relation to increased industrial demands of hydrogen from electrolysis. Results show that electricity imports, off-shore wind power and solar PV parks are the main contributors of electricity in the studied urban energy systems in all the scenarios. Regardless of the scenario, investments are made in hydrogen pipelines that will connect the three urban energy systems investigated. The scenario with an increase in industrial load before access to electricity import capacity reinforcements and off-shore wind power, gives substantially more investments in combined cycle gas turbines fuelled by biogas to meet the demand, as compared to the other scenarios. Additionally, in that same scenario, the total system cost is 18% higher compared to the scenario when the grid is reinforced and off-shore wind power investments available already from Year 2030, before an increase in industrial loads. This can be compared to an increase in total system cost of 4% with access to either grid reinforcements or off-shore wind power respectively from Year 2030, suggesting that access to off-shore wind power and/or electricity import capacity reinforcements are important for a large-scale industry electrification in the studied system. Towards 2080, all scenarios show similar results with regards to electricity and hydrogen supply, which suggests that the pathway between Years 2030 to 2040 will not affect the long-term, most-cost-effective solution. • Off-shore wind power and imported electricity are prioritized when available. • The total system cost becomes 18% higher without off-shore wind and electricity grid reinforcements. • Over-capacity of electrolysers and lined-rock caverns manage fluctuations in electricity supply. • Hydrogen pipelines are invested in from Year 2035 independent on scenario.

Authors

Institutions

Publication Details

Journal
International Journal of Hydrogen Energy
Published
2026-02-16
DOI
https://doi.org/10.1016/j.ijhydene.2026.153975
Primary Topic
Hybrid Renewable Energy Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Timely delivery of electricity for industrial hydrogen demands: path dependencies in the transition of urban energy systems

Maria Taljegård, Mariliis Lehtveer, Sofia Rosén, Lisa Göransson
International Journal of Hydrogen Energy
Hybrid Renewable Energy Systems
article

Timely delivery of electricity for industrial hydrogen demands: path dependencies in the transition of urban energy systems

Maria Taljegård, Mariliis Lehtveer, Sofia Rosén, Lisa Göransson
article en

Abstract

This study investigates how an increased demand of electricity to produce hydrogen through electrolysis affects three urban energy systems with hydrogen-based industries over a period of 50 years using an energy system optimisation model. Four scenarios are formulated based on access to electricity import capacity reinforcements and off-shore wind power in relation to increased industrial demands of hydrogen from electrolysis. Results show that electricity imports, off-shore wind power and solar PV parks are the main contributors of electricity in the studied urban energy systems in all the scenarios. Regardless of the scenario, investments are made in hydrogen pipelines that will connect the three urban energy systems investigated. The scenario with an increase in industrial load before access to electricity import capacity reinforcements and off-shore wind power, gives substantially more investments in combined cycle gas turbines fuelled by biogas to meet the demand, as compared to the other scenarios. Additionally, in that same scenario, the total system cost is 18% higher compared to the scenario when the grid is reinforced and off-shore wind power investments available already from Year 2030, before an increase in industrial loads. This can be compared to an increase in total system cost of 4% with access to either grid reinforcements or off-shore wind power respectively from Year 2030, suggesting that access to off-shore wind power and/or electricity import capacity reinforcements are important for a large-scale industry electrification in the studied system. Towards 2080, all scenarios show similar results with regards to electricity and hydrogen supply, which suggests that the pathway between Years 2030 to 2040 will not affect the long-term, most-cost-effective solution. • Off-shore wind power and imported electricity are prioritized when available. • The total system cost becomes 18% higher without off-shore wind and electricity grid reinforcements. • Over-capacity of electrolysers and lined-rock caverns manage fluctuations in electricity supply. • Hydrogen pipelines are invested in from Year 2035 independent on scenario.

International Journal of Hydrogen EnergyVol. 218
Göteborg Energi (Sweden) (SE), Chalmers University of Technology (SE)
Sustainable cities and communities
Openalex Percentile: Top 56%
Hybrid Renewable Energy Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.