Desarrollo de un modelo predictivo basado en máquinas de soporte vectorial para la productividad de pilotes perforados en proyectos de construcción residencial en Irak

Accurate prediction of construction productivity remains a critical challenge in the civil engineering sector, particularly for deep foundation works such as bored piles in residential projects. This study proposes a data-driven predictive model based on Support Vector Machine (SVM) to estimate the productivity of bored piles in high-rise residential construction projects in Iraq. Real-world data were collected from the Iraq Gate Residential Complex and used to train and validate the model. Key influencing factors included pile geometry, soil type, equipment specifications, crew size, and working hours. The model achieved a mean prediction accuracy of 99.89% and a correlation coefficient (R) of 97.02%, demonstrating superior performance over conventional estimation methods. These findings highlight the practical value of machine learning approaches in enhancing resource planning and decision-making during early project phases. The proposed SVM-based model can support contractors and engineers in forecasting performance outcomes and minimizing scheduling uncertainties in similar construction settings.

Authors

Publication Details

Journal
Magazine Portal Bibliotech Digital (Universidad Nacional de Colombia)
Published
2026-02-11
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Desarrollo de un modelo predictivo basado en máquinas de soporte vectorial para la productividad de pilotes perforados en proyectos de construcción residencial en Irak

Rana Maya, Mazin M. Sarhan, Faiq M. S. Al-Zwainy, Ibrahim Farouq Varouqa et al.
Magazine Portal Bibliotech Digital (Universidad Nacional de Colombia)
Construction Project Management and Performance
article

Desarrollo de un modelo predictivo basado en máquinas de soporte vectorial para la productividad de pilotes perforados en proyectos de construcción residencial en Irak

Rana Maya, Mazin M. Sarhan, Faiq M. S. Al-Zwainy, Ibrahim Farouq Varouqa, Aseel H. Obaid, Saja Hadi Raheem Al-Dhamad, Rana I. K. Zaki, Albert P.C. Chan, Gasim Hayder, Salman Dawood Salman Al-Dulaimi, Laith N. Ali
article en

Abstract

Accurate prediction of construction productivity remains a critical challenge in the civil engineering sector, particularly for deep foundation works such as bored piles in residential projects. This study proposes a data-driven predictive model based on Support Vector Machine (SVM) to estimate the productivity of bored piles in high-rise residential construction projects in Iraq. Real-world data were collected from the Iraq Gate Residential Complex and used to train and validate the model. Key influencing factors included pile geometry, soil type, equipment specifications, crew size, and working hours. The model achieved a mean prediction accuracy of 99.89% and a correlation coefficient (R) of 97.02%, demonstrating superior performance over conventional estimation methods. These findings highlight the practical value of machine learning approaches in enhancing resource planning and decision-making during early project phases. The proposed SVM-based model can support contractors and engineers in forecasting performance outcomes and minimizing scheduling uncertainties in similar construction settings.

Magazine Portal Bibliotech Digital (Universidad Nacional de Colombia)
Decent work and economic growth
Openalex Percentile: Top 59%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Desarrollo de un modelo predictivo basado en máquinas de soporte vectorial para la productividad de pilotes perforados en proyectos de construcción residencial en Irak — Rana Maya, Mazin M. Sarhan, et al. · Magazine Portal Bibliotech Digital (Universidad Nacional de Colombia) (2026) | TGRS Research Map | TGRS