CAPITAL BUDGETING AND SOCIO-ECONOMIC ANALYSIS: EVIDENCE OF THE NEW TRAMWAY PROJECT: ILIDŽA-HRASNICA

<p>Capital budgeting is one of the most important areas of financial management. Different techniques are used to evaluate capital investment budgeting projects: payback period (PP), net present value (NPV) and internal rate of return (IRR). Graham and Harvey (2002) point out that financial managers prefer the following methods: internal rate of return or undiscounted payback period. The Ilidža–Hrasnica tram line extension is one of Sarajevo’s most significant transport investments in decades, aiming to connect a long-neglected suburban corridor to the capital’s tram network. This paper evaluates the project’s viability using capital budgeting criteria, Net Present Value (NPV), and Internal Rate of Return (IRR), alongside a qualitative economic justification. The financial analysis, drawing on projected costs and ridership, suggests a positive NPV and an IRR in the 8–10% range, exceeding the relevant cost of capital, indicating the project is financially justified under reasonable assumptions. The results and discussion emphasize that while initial ridership and financial returns may be modest, even negative in the very early years, strategic planning and supportive policies can ensure the project’s long-run success. The study concludes that the Ilidža–Hrasnica tram line is a sound investment that will enhance the city’s sustainable development, and it recommends measures to maximize its inclusive benefits.</p>

Authors

Publication Details

Journal
BH Ekonomski forum
Published
2025-12-31
DOI
https://doi.org/10.62900/bhef252102003
Primary Topic
Capital Investment and Risk Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

CAPITAL BUDGETING AND SOCIO-ECONOMIC ANALYSIS: EVIDENCE OF THE NEW TRAMWAY PROJECT: ILIDŽA-HRASNICA

Jasmin Ademović
BH Ekonomski forum
Capital Investment and Risk Analysis
article

CAPITAL BUDGETING AND SOCIO-ECONOMIC ANALYSIS: EVIDENCE OF THE NEW TRAMWAY PROJECT: ILIDŽA-HRASNICA

Jasmin Ademović
article en

Abstract

<p>Capital budgeting is one of the most important areas of financial management. Different techniques are used to evaluate capital investment budgeting projects: payback period (PP), net present value (NPV) and internal rate of return (IRR). Graham and Harvey (2002) point out that financial managers prefer the following methods: internal rate of return or undiscounted payback period. The Ilidža–Hrasnica tram line extension is one of Sarajevo’s most significant transport investments in decades, aiming to connect a long-neglected suburban corridor to the capital’s tram network. This paper evaluates the project’s viability using capital budgeting criteria, Net Present Value (NPV), and Internal Rate of Return (IRR), alongside a qualitative economic justification. The financial analysis, drawing on projected costs and ridership, suggests a positive NPV and an IRR in the 8–10% range, exceeding the relevant cost of capital, indicating the project is financially justified under reasonable assumptions. The results and discussion emphasize that while initial ridership and financial returns may be modest, even negative in the very early years, strategic planning and supportive policies can ensure the project’s long-run success. The study concludes that the Ilidža–Hrasnica tram line is a sound investment that will enhance the city’s sustainable development, and it recommends measures to maximize its inclusive benefits.</p>

BH Ekonomski forumVol. 2(21)
Openalex Percentile: Top 21%
Capital Investment and Risk Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

CAPITAL BUDGETING AND SOCIO-ECONOMIC ANALYSIS: EVIDENCE OF THE NEW TRAMWAY PROJECT: ILIDŽA-HRASNICA — Jasmin Ademović · BH Ekonomski forum (2025) | TGRS Research Map | TGRS