A comprehensive framework for evaluating bridge project rework through earned value management (EVM) and building information modeling (BIM)

Rework represents a significant challenge to the successful delivery of bridge projects, with substantial implications for cost, schedule, and resource efficiency. This study investigates the impact of Building Information Modeling (BIM) on reducing rework in bridge construction, with particular emphasis on rework ratio, cost, and schedule performance. The research methodology combined pre- and post-interviews, data analysis, and a comparative evaluation of projects executed with and without BIM. The results suggest that BIM adoption can reduce rework-related inefficiencies, with observed reductions in time wastage of approximately 70-85% and cost savings in the range of 65-75% in the analyzed case study. Furthermore, Earned Value Management (EVM) analysis revealed improved performance metrics, with Schedule Performance Indicator (SPI) and Cost Performance Indicator (CPI) values increasing by 0.264 and 0.216, respectively. These findings provide indicative evidence that BIM has the potential to enhance cost and schedule outcomes in bridge construction by mitigating rework, though outcomes are context-dependent and may vary according to project scale, scope, and implementation practices. The study contributes to the growing body of knowledge on BIM-enabled project management and offers practical insights for industry practitioners seeking to improve project delivery effectiveness.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2026-02-14
DOI
https://doi.org/10.1038/s41598-025-27546-0
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A comprehensive framework for evaluating bridge project rework through earned value management (EVM) and building information modeling (BIM)

Ayman S. Hussein, Mohamed Badawy, Sara M. Elseufy
Scientific Reports
BIM and Construction Integration
article

A comprehensive framework for evaluating bridge project rework through earned value management (EVM) and building information modeling (BIM)

Ayman S. Hussein, Mohamed Badawy, Sara M. Elseufy
article en

Abstract

Rework represents a significant challenge to the successful delivery of bridge projects, with substantial implications for cost, schedule, and resource efficiency. This study investigates the impact of Building Information Modeling (BIM) on reducing rework in bridge construction, with particular emphasis on rework ratio, cost, and schedule performance. The research methodology combined pre- and post-interviews, data analysis, and a comparative evaluation of projects executed with and without BIM. The results suggest that BIM adoption can reduce rework-related inefficiencies, with observed reductions in time wastage of approximately 70-85% and cost savings in the range of 65-75% in the analyzed case study. Furthermore, Earned Value Management (EVM) analysis revealed improved performance metrics, with Schedule Performance Indicator (SPI) and Cost Performance Indicator (CPI) values increasing by 0.264 and 0.216, respectively. These findings provide indicative evidence that BIM has the potential to enhance cost and schedule outcomes in bridge construction by mitigating rework, though outcomes are context-dependent and may vary according to project scale, scope, and implementation practices. The study contributes to the growing body of knowledge on BIM-enabled project management and offers practical insights for industry practitioners seeking to improve project delivery effectiveness.

Scientific ReportsVol. 16(1)
Ain Shams University (EG)
Decent work and economic growth
Openalex Percentile: Top 55%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.