Rule-Based Digital Twin: An Integrated Parametric-BIM Workflow for Life-Cycle Delivery of Free-Form, Special-Shaped Envelopes in Large-Scale Public Buildings

Despite the aesthetic potential of free-form envelopes in large-scale public buildings, geometric interlacing complexity, ambiguous façade boundaries, and constructability translation gaps persist as systemic barriers. This study addresses these challenges through a Design Science Research (DSR) approach, developing a rule-based digital twin methodology that maintains parametric intelligence across the building life cycle. Implemented via a five-layer integrated framework, i.e., geometric, parametric, BIM, coordination, and fabrication, the methodology was validated through a revelatory case study of the Shenzhen Bay Culture Plaza. Results demonstrate 91.2% clash resolution prior to construction, 20.3 million RMB in cost savings (10.8% reduction), and 35.4% schedule compression, while preserving rule-based relationships into operational facility management. The study advances BIM theory by operationalizing life-cycle digital twins for non-standard geometries, offering a replicable framework for future special-shaped construction projects.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-02-13
DOI
https://doi.org/10.3390/buildings16040778
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Rule-Based Digital Twin: An Integrated Parametric-BIM Workflow for Life-Cycle Delivery of Free-Form, Special-Shaped Envelopes in Large-Scale Public Buildings

Xiang Li, Wei Gan, Jun Yang, Xiaopei Liu
Buildings
BIM and Construction Integration
article

Rule-Based Digital Twin: An Integrated Parametric-BIM Workflow for Life-Cycle Delivery of Free-Form, Special-Shaped Envelopes in Large-Scale Public Buildings

Xiang Li, Wei Gan, Jun Yang, Xiaopei Liu
article en

Abstract

Despite the aesthetic potential of free-form envelopes in large-scale public buildings, geometric interlacing complexity, ambiguous façade boundaries, and constructability translation gaps persist as systemic barriers. This study addresses these challenges through a Design Science Research (DSR) approach, developing a rule-based digital twin methodology that maintains parametric intelligence across the building life cycle. Implemented via a five-layer integrated framework, i.e., geometric, parametric, BIM, coordination, and fabrication, the methodology was validated through a revelatory case study of the Shenzhen Bay Culture Plaza. Results demonstrate 91.2% clash resolution prior to construction, 20.3 million RMB in cost savings (10.8% reduction), and 35.4% schedule compression, while preserving rule-based relationships into operational facility management. The study advances BIM theory by operationalizing life-cycle digital twins for non-standard geometries, offering a replicable framework for future special-shaped construction projects.

BuildingsVol. 16(4)
Tongji University (CN), Shenzhen Metro (China) (CN), Shanghai Tongji Urban Planning and Design Institute (CN), Zhejiang University of Technology (CN)
National Natural Science Foundation of China, Ministry of Housing and Urban-Rural Development
Responsible consumption and production
Openalex Percentile: Top 56%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.