Combined Kanban-POLCA Production Control in Two-Stage Sequential Hybrid MTS/MTO Production Systems: A Simulation-Based Evaluation

This paper analyzes the performance of a two-stage sequential hybrid MTS/MTO production system in which the order decoupling point is positioned between the manufacturing and assembly stages. In this configuration, the production control task separates into an upstream inventory control problem and a downstream order control problem. To address these jointly, this study examines a combined Kanban-POLCA (Paired-cell Overlapping Loops of Cards with Authorization) approach that applies Kanban to inventory control and POLCA to order control. The feasibility and behavior of this integrated system are evaluated through a simulation experiment. The results show that the considered control factors and their combinations significantly affect system performance, with the combined Kanban-POLCA system achieving superior results compared to the initial POLCA-POLCA system. Based on these findings, this paper outlines theoretical and practical implications that provide guidelines for designing and combining pull systems in two-stage production environments.

Authors

Institutions

Publication Details

Journal
Mathematics
Published
2026-02-13
DOI
https://doi.org/10.3390/math14040673
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Combined Kanban-POLCA Production Control in Two-Stage Sequential Hybrid MTS/MTO Production Systems: A Simulation-Based Evaluation

Matthias Thürer, Dragoslav Slović, Milena Gatić, Ivan Tomašević et al.
Mathematics
Scheduling and Optimization Algorithms
article

Combined Kanban-POLCA Production Control in Two-Stage Sequential Hybrid MTS/MTO Production Systems: A Simulation-Based Evaluation

Matthias Thürer, Dragoslav Slović, Milena Gatić, Ivan Tomašević, Nemanja Tulimirović, D. B. Stojanović, Barbara Simeunović
article en

Abstract

This paper analyzes the performance of a two-stage sequential hybrid MTS/MTO production system in which the order decoupling point is positioned between the manufacturing and assembly stages. In this configuration, the production control task separates into an upstream inventory control problem and a downstream order control problem. To address these jointly, this study examines a combined Kanban-POLCA (Paired-cell Overlapping Loops of Cards with Authorization) approach that applies Kanban to inventory control and POLCA to order control. The feasibility and behavior of this integrated system are evaluated through a simulation experiment. The results show that the considered control factors and their combinations significantly affect system performance, with the combined Kanban-POLCA system achieving superior results compared to the initial POLCA-POLCA system. Based on these findings, this paper outlines theoretical and practical implications that provide guidelines for designing and combining pull systems in two-stage production environments.

MathematicsVol. 14(4)
Chemnitz University of Technology (DE), University of Belgrade (RS)
Openalex Percentile: Top 59%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Combined Kanban-POLCA Production Control in Two-Stage Sequential Hybrid MTS/MTO Production Systems: A Simulation-Based Evaluation — Matthias Thürer, Dragoslav Slović, et al. · Mathematics (2026) | TGRS Research Map | TGRS