Sustainability-based barriers to adopting offsite construction in Jordan

Purpose The paper presents the major barriers to Offsite Construction (OSC) adoption in Jordan from a Triple Bottom Line (TBL) sustainability framework. It also recommends steps to enhance OSC implementation in the Jordanian construction industry. Design/methodology/approach A quantitative approach was used to generalise findings and draw conclusions. Exploratory Factor Analysis (EFA) was applied to establish relationships between variables and group them into the proposed components based on 208 valid responses from construction professionals in Jordan. EFA and descriptive statistics using SPSS developed a hierarchy of barriers to OSC adoption. Findings The lack of regulations, standards, and incentives, the lack of adequate labourers, and long lead times and time certainty issues were identified as the three most important variables. At the same time, the uncertainty of energy performance was considered the least important variable affecting the Jordanian OSC sector. Research limitations/implications Given that the research focused on OSC adoption in the Jordanian construction industry, and the data was collected from Jordan only, the findings are applicable to the Jordanian context only. This exploratory study highlights implications for further investigations into the barriers to OSC adoption in Jordan. Practical implications The anticipated outcome is to help practitioners understand the challenges associated with the low adoption of OSC in Jordan. The identified variables and recommendations can guide strategic decisions, including assessments and benchmarking, fostering OSC development in Jordan. Originality/value This research identifies barriers to OSC adoption in Jordan and offers unique insights into the variables that hinder OSC uptake from a sustainability perspective.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2026-02-11
DOI
https://doi.org/10.1108/ecam-04-2025-0601
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Sustainability-based barriers to adopting offsite construction in Jordan

Mahmood Alam, Rubina Islam, Hasan D. Badran, Imran Rafiq et al.
Engineering Construction & Architectural Management
Construction Project Management and Performance
article

Sustainability-based barriers to adopting offsite construction in Jordan

Mahmood Alam, Rubina Islam, Hasan D. Badran, Imran Rafiq, Mohammed Arif
article en

Abstract

Purpose The paper presents the major barriers to Offsite Construction (OSC) adoption in Jordan from a Triple Bottom Line (TBL) sustainability framework. It also recommends steps to enhance OSC implementation in the Jordanian construction industry. Design/methodology/approach A quantitative approach was used to generalise findings and draw conclusions. Exploratory Factor Analysis (EFA) was applied to establish relationships between variables and group them into the proposed components based on 208 valid responses from construction professionals in Jordan. EFA and descriptive statistics using SPSS developed a hierarchy of barriers to OSC adoption. Findings The lack of regulations, standards, and incentives, the lack of adequate labourers, and long lead times and time certainty issues were identified as the three most important variables. At the same time, the uncertainty of energy performance was considered the least important variable affecting the Jordanian OSC sector. Research limitations/implications Given that the research focused on OSC adoption in the Jordanian construction industry, and the data was collected from Jordan only, the findings are applicable to the Jordanian context only. This exploratory study highlights implications for further investigations into the barriers to OSC adoption in Jordan. Practical implications The anticipated outcome is to help practitioners understand the challenges associated with the low adoption of OSC in Jordan. The identified variables and recommendations can guide strategic decisions, including assessments and benchmarking, fostering OSC development in Jordan. Originality/value This research identifies barriers to OSC adoption in Jordan and offers unique insights into the variables that hinder OSC uptake from a sustainability perspective.

Engineering Construction & Architectural Management
London Metropolitan University (GB), Petra University (JO), University College of Estate Management (GB), University of Brighton (GB)
Industry, innovation and infrastructure
Openalex Percentile: Top 61%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.