Job shop scheduling with unit processing times under uncertainties: Sequential flexibility and new lower-bound

This paper studies the Job Shop Scheduling Problem (JSSP) with Unit Processing Times evolving in an uncertain environment. Our aim is to determine a set of solutions instead of a unique solution in order to manage unanticipated events. To achieve this, an approach integrating two techniques is presented to achieve sequential flexibility. In the first time, the decomposition of the initial problem into sub-problems is exploited for producing a dominant schedule. Then, based on the Group Sequence (GS) method, a set of schedules is constructed, allowing for sequential flexibility with an evaluation of performance. The present work also develops a new lower bound for the GS and compares it with an existing lower bound from the literature. Using benchmark data sets, computational studies demonstrate that the suggested lower bound significantly outperforms the established lower bound found in the literature. In addition, our approach succeeded in finding a set of solutions for all tested benchmarks within a reasonable amount of CPU time. Moreover, two interesting flexibility indicators are presented to evaluate the efficacy of our approach.

Authors

Institutions

Publication Details

Journal
Advances in Mechanical Engineering
Published
2026-02-01
DOI
https://doi.org/10.1177/16878132251405002
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Job shop scheduling with unit processing times under uncertainties: Sequential flexibility and new lower-bound

Samia Ourari, Sara Bouguessa
Advances in Mechanical Engineering
Scheduling and Optimization Algorithms
article

Job shop scheduling with unit processing times under uncertainties: Sequential flexibility and new lower-bound

Samia Ourari, Sara Bouguessa
article en

Abstract

This paper studies the Job Shop Scheduling Problem (JSSP) with Unit Processing Times evolving in an uncertain environment. Our aim is to determine a set of solutions instead of a unique solution in order to manage unanticipated events. To achieve this, an approach integrating two techniques is presented to achieve sequential flexibility. In the first time, the decomposition of the initial problem into sub-problems is exploited for producing a dominant schedule. Then, based on the Group Sequence (GS) method, a set of schedules is constructed, allowing for sequential flexibility with an evaluation of performance. The present work also develops a new lower bound for the GS and compares it with an existing lower bound from the literature. Using benchmark data sets, computational studies demonstrate that the suggested lower bound significantly outperforms the established lower bound found in the literature. In addition, our approach succeeded in finding a set of solutions for all tested benchmarks within a reasonable amount of CPU time. Moreover, two interesting flexibility indicators are presented to evaluate the efficacy of our approach.

Advances in Mechanical EngineeringVol. 18(2)
University of Boumerdes (DZ)
Decent work and economic growth
Openalex Percentile: Top 60%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.