From Fragmentation to Integration: An Empirical Study on Enhancing Design–Construction Interface Management in EPC Landscape Projects

The EPC model is currently the mainstream implementation approach for landscape projects, but fragmented management of the design–construction interface constrains project performance. Addressing issues such as cost overruns and schedule delays caused by ambiguous responsibility allocation, inefficient information transfer, and frequent design changes in EPC landscape projects, this paper focuses on the Xiaoyalong Wetland Park project in Kashi, Xinjiang, as a core case study. Combined with research on 12 representative projects, it identifies 16 interface management factors across four dimensions: contract management, organizational coordination, technical support, and ecological–artistic integration. Employing a mixed-methods approach combining questionnaire surveys (186 valid samples) and semi-structured interviews, validated through SPSS and structural equation modeling, this study confirms that early collaborative design serves as a core driver. Based on empirical findings, it derives and proposes a three-tiered optimization strategy: “foundation at the root layer, coordination at the transition layer, and assurance at the direct layer”. Pilot application of this strategy demonstrated significant effectiveness, reducing design change rates by 32%, shortening coordination time by 28%, and lowering cost overrun rates by 15%. This study enriches the theoretical framework of interface management in landscape engineering EPC projects and provides practical guidance for similar projects in arid regions.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-02-12
DOI
https://doi.org/10.3390/buildings16040763
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

From Fragmentation to Integration: An Empirical Study on Enhancing Design–Construction Interface Management in EPC Landscape Projects

Jie Ma, Chaochao Sun, Jili QIU, Shiguo Xu et al.
Buildings
Construction Project Management and Performance
article

From Fragmentation to Integration: An Empirical Study on Enhancing Design–Construction Interface Management in EPC Landscape Projects

Jie Ma, Chaochao Sun, Jili QIU, Shiguo Xu, Xinlin Song, Chunyang Liu, Dali Zhang, Yuhang Li, Xiaodong Zhao
article en

Abstract

The EPC model is currently the mainstream implementation approach for landscape projects, but fragmented management of the design–construction interface constrains project performance. Addressing issues such as cost overruns and schedule delays caused by ambiguous responsibility allocation, inefficient information transfer, and frequent design changes in EPC landscape projects, this paper focuses on the Xiaoyalong Wetland Park project in Kashi, Xinjiang, as a core case study. Combined with research on 12 representative projects, it identifies 16 interface management factors across four dimensions: contract management, organizational coordination, technical support, and ecological–artistic integration. Employing a mixed-methods approach combining questionnaire surveys (186 valid samples) and semi-structured interviews, validated through SPSS and structural equation modeling, this study confirms that early collaborative design serves as a core driver. Based on empirical findings, it derives and proposes a three-tiered optimization strategy: “foundation at the root layer, coordination at the transition layer, and assurance at the direct layer”. Pilot application of this strategy demonstrated significant effectiveness, reducing design change rates by 32%, shortening coordination time by 28%, and lowering cost overrun rates by 15%. This study enriches the theoretical framework of interface management in landscape engineering EPC projects and provides practical guidance for similar projects in arid regions.

BuildingsVol. 16(4)
Tongji University (CN), University of Shanghai for Science and Technology (CN), Dalian University of Technology (CN), Shenzhen General Institute of Architectural Design and Research (China) (CN), Dalian University (CN), Institute of Occupational Safety (SI), Kashi University (CN)
Openalex Percentile: Top 62%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.