Estimation of Control Intervals for Reinforcement Learning-Based Manufacturing-Line Control

Abstract Generative AI is reshaping manufacturing by generating designs, diagnosing bottlenecks, and optimizing complex systems, which includes controlling manufacturing lines. Efficient control of manufacturing lines requires coordinated decisions in routing, worker allocation, and scheduling. Although model-based approaches can yield optimal or near-optimal plans, they struggle to scale more complex systems. With advances in discrete-event simulation and AI-driven decision-making, generative decision models, such as reinforcement learning (RL), have emerged as alternatives for optimizing manufacturing systems. We show that a crucial design choice is the policy control interval. Because parts take time to propagate through stations and buffers in manufacturing systems, choosing this interval without analysis can result in suboptimal behavior and lower throughput. We introduce a layout-aware method for selecting the control interval in policy training. From the line layout, we estimate the distribution of end-to-end unit transit times and derive a control interval based on the distribution. Our results demonstrate that policy performance versus control interval is non-monotonic with an interior optimum. Aligning the control interval with the dynamics of the manufacturing process yields gains up to 2.7× improvement in return and increased training stability relative to one-tick baselines, without modifying environments or algorithms. These results indicate that the control interval is a crucial factor the agent learning process. By aligning the control interval of policies with the way material flows, our method provides a plug-and-play procedure for a more robust RL in manufacturing control.

Authors

Institutions

Publication Details

Journal
Journal of Computing and Information Science in Engineering
Published
2026-02-12
DOI
https://doi.org/10.1115/1.4071110
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Estimation of Control Intervals for Reinforcement Learning-Based Manufacturing-Line Control

Omar Ashour, Conrad S. Tucker, Chen-Wei Guo, Christian López
Journal of Computing and Information Science in Engineering
Scheduling and Optimization Algorithms
article

Estimation of Control Intervals for Reinforcement Learning-Based Manufacturing-Line Control

Omar Ashour, Conrad S. Tucker, Chen-Wei Guo, Christian López
article en

Abstract

Abstract Generative AI is reshaping manufacturing by generating designs, diagnosing bottlenecks, and optimizing complex systems, which includes controlling manufacturing lines. Efficient control of manufacturing lines requires coordinated decisions in routing, worker allocation, and scheduling. Although model-based approaches can yield optimal or near-optimal plans, they struggle to scale more complex systems. With advances in discrete-event simulation and AI-driven decision-making, generative decision models, such as reinforcement learning (RL), have emerged as alternatives for optimizing manufacturing systems. We show that a crucial design choice is the policy control interval. Because parts take time to propagate through stations and buffers in manufacturing systems, choosing this interval without analysis can result in suboptimal behavior and lower throughput. We introduce a layout-aware method for selecting the control interval in policy training. From the line layout, we estimate the distribution of end-to-end unit transit times and derive a control interval based on the distribution. Our results demonstrate that policy performance versus control interval is non-monotonic with an interior optimum. Aligning the control interval with the dynamics of the manufacturing process yields gains up to 2.7× improvement in return and increased training stability relative to one-tick baselines, without modifying environments or algorithms. These results indicate that the control interval is a crucial factor the agent learning process. By aligning the control interval of policies with the way material flows, our method provides a plug-and-play procedure for a more robust RL in manufacturing control.

Journal of Computing and Information Science in Engineering
Burke Foundation (US), APT Therapeutics (United States) (US), Forbes Hospital (US), Rockwell Automation (United States) (US)
National Science Foundation
Peace, Justice and strong institutions
Openalex Percentile: Top 60%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.