Proactive Maintenance Plan for Kuthiran Tunnel Using Primavera P6

The Kuthiran Tunnel, a critical infrastructure component in the challenging terrain of Kerala, India, requires a systematic and proactive maintenance strategy to ensure its structural integrity, operational safety, and long-term functionality. Traditional reactive maintenance approaches are often inadequate for such complex, high-traffic, and environmentally sensitive structures, leading to unexpected failures, prolonged closures, and increased life-cycle costs. This paper proposes a Proactive Maintenance Plan (PMP) developed and scheduled using Primavera P6, a leading enterprise project management software. The plan integrates condition-based monitoring, predictive maintenance triggers, resource-level scheduling, and risk-aware activity sequencing to transition from corrective to preventive and predictive maintenance paradigms. Key components include structural health monitoring (SHM) integration, environmental impact considerations, safety compliance milestones, and optimized resource allocation for labour, materials, and equipment. The study demonstrates how Primavera P6 can be utilized to create a dynamic, adaptable, and visually coherent maintenance schedule that accounts for real-time data inputs, seasonal constraints, traffic management requirements, and regulatory inspections. The proposed framework aims to reduce unplanned downtime, extend tunnel lifespan, enhance safety, and optimize maintenance budgets. This research contributes to the field of infrastructure asset management by providing a replicable digital model for large-scale tunnel maintenance in hilly and eco-sensitive regions.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-02-11
DOI
https://doi.org/10.5281/zenodo.18604449
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Proactive Maintenance Plan for Kuthiran Tunnel Using Primavera P6

Muhsina. P., Ms. P. Mangaiyar Thilagam, Ms. S. Abitha, Dr. D. bhuvaneswari
Zenodo (CERN European Organization for Nuclear Research)
Infrastructure Maintenance and Monitoring
article

Proactive Maintenance Plan for Kuthiran Tunnel Using Primavera P6

Muhsina. P., Ms. P. Mangaiyar Thilagam, Ms. S. Abitha, Dr. D. bhuvaneswari
article en

Abstract

The Kuthiran Tunnel, a critical infrastructure component in the challenging terrain of Kerala, India, requires a systematic and proactive maintenance strategy to ensure its structural integrity, operational safety, and long-term functionality. Traditional reactive maintenance approaches are often inadequate for such complex, high-traffic, and environmentally sensitive structures, leading to unexpected failures, prolonged closures, and increased life-cycle costs. This paper proposes a Proactive Maintenance Plan (PMP) developed and scheduled using Primavera P6, a leading enterprise project management software. The plan integrates condition-based monitoring, predictive maintenance triggers, resource-level scheduling, and risk-aware activity sequencing to transition from corrective to preventive and predictive maintenance paradigms. Key components include structural health monitoring (SHM) integration, environmental impact considerations, safety compliance milestones, and optimized resource allocation for labour, materials, and equipment. The study demonstrates how Primavera P6 can be utilized to create a dynamic, adaptable, and visually coherent maintenance schedule that accounts for real-time data inputs, seasonal constraints, traffic management requirements, and regulatory inspections. The proposed framework aims to reduce unplanned downtime, extend tunnel lifespan, enhance safety, and optimize maintenance budgets. This research contributes to the field of infrastructure asset management by providing a replicable digital model for large-scale tunnel maintenance in hilly and eco-sensitive regions.

Zenodo (CERN European Organization for Nuclear Research)
Industry, innovation and infrastructure
Openalex Percentile: Top 60%
Infrastructure Maintenance and Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Proactive Maintenance Plan for Kuthiran Tunnel Using Primavera P6 — Muhsina. P., Ms. P. Mangaiyar Thilagam, et al. · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS