Cost Overrun in Residential Projects

The construction industry faces significant challenges in managing cost and schedule performance due to material price fluctuations, labor variability, design modifications, and complex project planning. Accurate monitoring of budget versus actual costs is critical, particularly in residential building projects ranging from G+2 to G+5. Earned Value Management (EVM), integrated with digital project management tools such as Primavera P6, provides a quantitative framework for assessing project performance by linking scope, cost, and schedule data. This literature review synthesizes studies from 2020–2024, examining the application of Primavera P6 for cost-loaded scheduling, progress tracking, and EVM metric computation (PV, EV, AC, CV, SV, CPI, SPI). The review highlights case studies demonstrating the effectiveness of quantity-based progress measurement, weekly actual cost updates, and baseline management in predicting cost overruns and schedule slippages. Challenges such as data entry inconsistencies, material price volatility, and misestimation of progress are discussed, along with resource optimization and time–cost trade-off strategies. Best practices for accurate budget versus actual analysis are identified, including cost-loading, baseline locking, integration with site accounting systems, and regular variance monitoring. The review concludes with identified research gaps, including the integration of AI/ML for predictive forecasting, multi-project tracking, and standardized methods for material price adjustment. This study provides a comprehensive framework for practitioners and researchers aiming to improve cost and schedule performance evaluation in residential construction using Primavera P6 and EVM.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-02-09
DOI
https://doi.org/10.5281/zenodo.18532302
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost Overrun in Residential Projects

Ms. P. Mangaiyar Thilagam, A. Sujith Kumar, Dr. D. Bhuvaneswari, Muhammed Rafeek P. A.
Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

Cost Overrun in Residential Projects

Ms. P. Mangaiyar Thilagam, A. Sujith Kumar, Dr. D. Bhuvaneswari, Muhammed Rafeek P. A.
article en

Abstract

The construction industry faces significant challenges in managing cost and schedule performance due to material price fluctuations, labor variability, design modifications, and complex project planning. Accurate monitoring of budget versus actual costs is critical, particularly in residential building projects ranging from G+2 to G+5. Earned Value Management (EVM), integrated with digital project management tools such as Primavera P6, provides a quantitative framework for assessing project performance by linking scope, cost, and schedule data. This literature review synthesizes studies from 2020–2024, examining the application of Primavera P6 for cost-loaded scheduling, progress tracking, and EVM metric computation (PV, EV, AC, CV, SV, CPI, SPI). The review highlights case studies demonstrating the effectiveness of quantity-based progress measurement, weekly actual cost updates, and baseline management in predicting cost overruns and schedule slippages. Challenges such as data entry inconsistencies, material price volatility, and misestimation of progress are discussed, along with resource optimization and time–cost trade-off strategies. Best practices for accurate budget versus actual analysis are identified, including cost-loading, baseline locking, integration with site accounting systems, and regular variance monitoring. The review concludes with identified research gaps, including the integration of AI/ML for predictive forecasting, multi-project tracking, and standardized methods for material price adjustment. This study provides a comprehensive framework for practitioners and researchers aiming to improve cost and schedule performance evaluation in residential construction using Primavera P6 and EVM.

Zenodo (CERN European Organization for Nuclear Research)
Industry, innovation and infrastructure
Openalex Percentile: Top 66%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Cost Overrun in Residential Projects — Ms. P. Mangaiyar Thilagam, A. Sujith Kumar, et al. · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS