Sustainable Project Planning in Hilly Terrain

Construction in hilly and environmentally sensitive regions is very different from building on flat land. Steep slopes, limited road access, frequent weather changes, and strict environmental rules constantly disrupt project schedules. Because of these challenges, traditional planning methods often fail, leading to delays, cost overruns, and unsafe working conditions. Recent research shows a major shift toward smarter and more flexible scheduling methods supported by digital tools, spatial data, real-time monitoring, and sustainability-based planning. This review brings together key findings on how construction projects in hilly regions can be planned and managed more effectively. It highlights how modern scheduling software, terrain-informed planning, productivity modelling, environmental timing windows, and circular-material workflows can significantly improve project delivery. The review ends with an integrated framework that connects terrain conditions, digital tools, environmental needs, and project performances showing how better scheduling can lead to safer, faster, and greener construction.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-02-09
DOI
https://doi.org/10.5281/zenodo.18531660
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Sustainable Project Planning in Hilly Terrain

Bindya U.B., Ms. P. Mangaiyar Thilagam, A. Sujith Kumar, Dr. D. Bhuvaneswari
Zenodo (CERN European Organization for Nuclear Research)
BIM and Construction Integration
article

Sustainable Project Planning in Hilly Terrain

Bindya U.B., Ms. P. Mangaiyar Thilagam, A. Sujith Kumar, Dr. D. Bhuvaneswari
article en

Abstract

Construction in hilly and environmentally sensitive regions is very different from building on flat land. Steep slopes, limited road access, frequent weather changes, and strict environmental rules constantly disrupt project schedules. Because of these challenges, traditional planning methods often fail, leading to delays, cost overruns, and unsafe working conditions. Recent research shows a major shift toward smarter and more flexible scheduling methods supported by digital tools, spatial data, real-time monitoring, and sustainability-based planning. This review brings together key findings on how construction projects in hilly regions can be planned and managed more effectively. It highlights how modern scheduling software, terrain-informed planning, productivity modelling, environmental timing windows, and circular-material workflows can significantly improve project delivery. The review ends with an integrated framework that connects terrain conditions, digital tools, environmental needs, and project performances showing how better scheduling can lead to safer, faster, and greener construction.

Zenodo (CERN European Organization for Nuclear Research)
Life in Land
Openalex Percentile: Top 62%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.