Framework for Integrating 4D/5D Bim, Scan to Bim, and EVM for Enhanced Delivery Performance
Infrastructure projects frequently experience cost overruns and schedule delays due to fragmented design, planning, and cost management practices. This study presents a techno-managerial implementation of 5D Building Information Modeling (BIM) for infrastructure projects by integrating 3D models with time and cost data through a standardized workflow. The proposed framework employs BIM platform as a unified 5D BIM platform for integrating quantities, schedules, costs, and cash flow analysis. Embedding EVM within the model and visualizing results through a Power BI dashboard enabled reliable, real-time performance monitoring. Scan-to-BIM–based progress verification further improved data accuracy, leading to enhanced cost certainty, forecasting reliability, and informed decision-making in infrastructure projects.
Authors
- Fauwaz Parkar (ORCID: https://orcid.org/0009-0007-5818-100X)
- HAIDER RIZVI
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-01-03
- DOI
- https://doi.org/10.5281/zenodo.18515363
- Primary Topic
- BIM and Construction Integration
- Type
- article
- Field-Weighted Citation Impact
- 0.00