BIM for flood mitigation: A survey-based case study

The construction industry is increasingly adopting digital technologies, with Building Inform- ation Modelling (BIM) gaining attention for enhancing flood mitigation planning. However, in Johor Bahru, where flood risks rise due to rapid urbanisation, BIM adoption for flood mitigation remains limited by knowledge gaps, technical and policy barriers, and weak stake- holder collaboration. This study aims to determine current BIM adoption levels, investigate barriers, and propose strategies to improve implementation in flood mitigation projects. A quantitative approach was employed using a questionnaire survey within a case study con- tractor organisation. Findings show 66.7 % of respondents frequently use BIM, with 60 % applying it at Level 3 maturity (fully integrated collaboration). Key barriers include high investment costs, lack of expertise, and limited access to accurate data. Proposed strategies include leadership support, training, financial incentives, and regulatory alignment. While adoption shows positive trends, wider implementation requires coordinated efforts to enhance BIM’s role in flood-resilient urban infrastructure.

Authors

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-12-01
DOI
https://doi.org/10.17512/bozpe.2025.14.24
Primary Topic
Flood Risk Assessment and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

BIM for flood mitigation: A survey-based case study

Mohd. Faiz Shapiai, Joanna A. Pawłowicz, Anees Ahmed Vighio, Faridahanim Binti Ahmad et al.
SHILAP Revista de lepidopterología
Flood Risk Assessment and Management
article

BIM for flood mitigation: A survey-based case study

Mohd. Faiz Shapiai, Joanna A. Pawłowicz, Anees Ahmed Vighio, Faridahanim Binti Ahmad, Lim Thiam Hao
article en

Abstract

The construction industry is increasingly adopting digital technologies, with Building Inform- ation Modelling (BIM) gaining attention for enhancing flood mitigation planning. However, in Johor Bahru, where flood risks rise due to rapid urbanisation, BIM adoption for flood mitigation remains limited by knowledge gaps, technical and policy barriers, and weak stake- holder collaboration. This study aims to determine current BIM adoption levels, investigate barriers, and propose strategies to improve implementation in flood mitigation projects. A quantitative approach was employed using a questionnaire survey within a case study con- tractor organisation. Findings show 66.7 % of respondents frequently use BIM, with 60 % applying it at Level 3 maturity (fully integrated collaboration). Key barriers include high investment costs, lack of expertise, and limited access to accurate data. Proposed strategies include leadership support, training, financial incentives, and regulatory alignment. While adoption shows positive trends, wider implementation requires coordinated efforts to enhance BIM’s role in flood-resilient urban infrastructure.

SHILAP Revista de lepidopterología
Mehran University of Engineering and Technology (PK), Malaysia University of Science and Technology (MY), KPJ Ampang Puteri Specialist Hospital (MY), University of Technology Malaysia (MY), University of Warmia and Mazury in Olsztyn (PL)
Sustainable cities and communities
Openalex Percentile: Top 31%
Flood Risk Assessment and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.