Investigating The Financial Viability of Hydropower Projects in Zambia: Case of Kafue Lower Hydropower Project.

The Model for Financial Analysis of Electric Sector Expansion Plans (FINPLAN) was used to assess the financial viability of the Kafue Lower Hydropower Project (KGL HPP) in Zambia. Three major scenarios were the focus of the analysis: capital structure (debt-equity ratio), climate change (drought conditions) and debt restructuring (payback duration). The capital structure of 85:15 debt equity ratio provided a stronger initial leverage while the 70:30 structure had faster dividend payouts creating a more favorable trade off for equity investors, despite its slightly lower IRR The project's Net Present Value (NPV) and Internal Rate of Return (IRR) were both above crucial levels, indicating that it is still robustly financially viable under drought stress. The trade-off between a shorter and longer payback period was between higher total profit and more stable annual debt coverage Based on the modelling results, new projects should be required to undergo climate stress assessment and prioritize robust finance frameworks.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-02-05
DOI
https://doi.org/10.5281/zenodo.18499173
Primary Topic
Capital Investment and Risk Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Investigating The Financial Viability of Hydropower Projects in Zambia: Case of Kafue Lower Hydropower Project.

Fredrick Mwenya Mubanga
Zenodo (CERN European Organization for Nuclear Research)
Capital Investment and Risk Analysis
article

Investigating The Financial Viability of Hydropower Projects in Zambia: Case of Kafue Lower Hydropower Project.

Fredrick Mwenya Mubanga
article en

Abstract

The Model for Financial Analysis of Electric Sector Expansion Plans (FINPLAN) was used to assess the financial viability of the Kafue Lower Hydropower Project (KGL HPP) in Zambia. Three major scenarios were the focus of the analysis: capital structure (debt-equity ratio), climate change (drought conditions) and debt restructuring (payback duration). The capital structure of 85:15 debt equity ratio provided a stronger initial leverage while the 70:30 structure had faster dividend payouts creating a more favorable trade off for equity investors, despite its slightly lower IRR The project's Net Present Value (NPV) and Internal Rate of Return (IRR) were both above crucial levels, indicating that it is still robustly financially viable under drought stress. The trade-off between a shorter and longer payback period was between higher total profit and more stable annual debt coverage Based on the modelling results, new projects should be required to undergo climate stress assessment and prioritize robust finance frameworks.

Zenodo (CERN European Organization for Nuclear Research)
Zero Emissions Resource Organisation (NO)
Climate action
Openalex Percentile: Top 68%
Capital Investment and Risk Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.