Lost-in-hole preventive initiative to successfully drill deep geothermal project in Continental Europe

In 2023, a major energy provider and operator of an extensive district heating network announced the development of a deep geothermal power plant. By the end of 2024, drilling operations commenced, and by May 2025, the third and final well successfully reached its planned total depth, targeting a naturally occurring hot water reservoir approximately 3,000 meters below the surface.As of now, production testing—intended to assess formation water temperature, chemical composition, and flow rates—has not been conducted. Therefore, this paper focuses on the planning and execution phases of the drilling campaign.We will present an application of the Weatherford’s Lost-in-Hole (LIH) Preventive Initiative as a continuous improvement strategy, highlighting lessons learned from the first to the third well. Emphasis is placed on the joint efforts of Weatherford’s Drilling Engineering and Interpretation and Evaluation teams in accurately interpreting downhole and surface data to assess risks and inform our client on mitigation strategies and drilling practices. It incorporates a two-phased assessment approach: an initial risk screening for early identification of high-risk well sections, followed by an in-depth assessment to develop targeted mitigation strategies. A Well Management System was developed and used to store and share Drilling Engineering studies, data and lessons learned from offset wells and LIH risk based on the Well Complexity Index (WCI).The Initiative serves as a replicable example, crucial for minimizing wellbore stability issues, preventing lost-in-hole incidents and tool damage, reducing Non-Productive Time (NPT), and ultimately enhancing drilling performance across the project.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-11-19
DOI
https://doi.org/10.5281/zenodo.18312984
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Lost-in-hole preventive initiative to successfully drill deep geothermal project in Continental Europe

Davide Di Tommaso, Michael Phillips, Mateusz Bedzyk
Zenodo (CERN European Organization for Nuclear Research)
Drilling and Well Engineering
article

Lost-in-hole preventive initiative to successfully drill deep geothermal project in Continental Europe

Davide Di Tommaso, Michael Phillips, Mateusz Bedzyk
article en

Abstract

In 2023, a major energy provider and operator of an extensive district heating network announced the development of a deep geothermal power plant. By the end of 2024, drilling operations commenced, and by May 2025, the third and final well successfully reached its planned total depth, targeting a naturally occurring hot water reservoir approximately 3,000 meters below the surface.As of now, production testing—intended to assess formation water temperature, chemical composition, and flow rates—has not been conducted. Therefore, this paper focuses on the planning and execution phases of the drilling campaign.We will present an application of the Weatherford’s Lost-in-Hole (LIH) Preventive Initiative as a continuous improvement strategy, highlighting lessons learned from the first to the third well. Emphasis is placed on the joint efforts of Weatherford’s Drilling Engineering and Interpretation and Evaluation teams in accurately interpreting downhole and surface data to assess risks and inform our client on mitigation strategies and drilling practices. It incorporates a two-phased assessment approach: an initial risk screening for early identification of high-risk well sections, followed by an in-depth assessment to develop targeted mitigation strategies. A Well Management System was developed and used to store and share Drilling Engineering studies, data and lessons learned from offset wells and LIH risk based on the Well Complexity Index (WCI).The Initiative serves as a replicable example, crucial for minimizing wellbore stability issues, preventing lost-in-hole incidents and tool damage, reducing Non-Productive Time (NPT), and ultimately enhancing drilling performance across the project.

Zenodo (CERN European Organization for Nuclear Research)
Openalex Percentile: Top 30%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.