Design and Radiation Qualification of a New User Interface for the LHC Beam Interlock System
The new BIS User Interface (CIBU) and its power supply (CIBD) were qualified in radiation. Components were first tested with a mono-energetic focused proton beam, followed by a full system-level validation at the CHARM facility. The results confirmed the electronics reliability and readiness for operation in a HL-LHC environment.
Authors
- G. Foucard
- Rudy Ferraro (ORCID: https://orcid.org/0000-0001-6486-1668)
- Christophe Martin
- Jan Uythoven
- Ivan Romera Ramirez
- Salvatore Danzeca
- Giuseppe Lerner
- Antoine Colinet
- Raffaello Secondo
Institutions
- Target (United States) (US)
- Flex (United States) (US)
- Integrity Systems (United States) (US)
Publication Details
- Published
- 2025-10-02
- DOI
- https://doi.org/10.1109/radecs66956.2025.11370363
- Primary Topic
- Particle accelerators and beam dynamics
- Type
- article
- Field-Weighted Citation Impact
- 0.00