In Situ Monitoring Consolidation and Hardening Behaviors of an <scp>HDPE</scp> Geomembrane‐Cement‐Bentonite Composite Cutoff Wall

Abstract Vertical cutoff walls are commonly used for containment of contaminants and polluted groundwater. In this paper, an in situ multi‐parameter monitoring system that includes soil pressure, pore water pressure, and bulk electrical conductivity was installed in a 23.5‐m deep HDPE‐cement‐bentonite (HCB) cutoff wall, with the data collected from the first 20 d are presented herein. The shallow zone (≤2.5 m) became unsaturated after 2 d, triggering surface settlement, “CB mixture‐geomembrane” or “CB mixture‐trench sidewall” detachment, and shrinkage cracks; the intermediate zone (5–7.5 m) developed 80‐kPa suction on Day 4, while deeper responses lagged. Lateral pressure showed a V‐shaped trend, that is, initial hydration‐induced drop followed by a pressure increase due to bentonite swelling. Bulk electrical conductivity (3000–4000 mS/m) decreased overall but varied with the permeability of surrounding soil. The temperature evolution comprised three distinct stages: hydration heating, cooling, and stabilization.

Authors

Publication Details

Journal
Groundwater Monitoring & Remediation
Published
2026-02-05
DOI
https://doi.org/10.1111/gwmr.70031
Primary Topic
Landfill Environmental Impact Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

In Situ Monitoring Consolidation and Hardening Behaviors of an HDPE Geomembrane‐Cement‐Bentonite Composite Cutoff Wall

Zheng‐kai Wang, Wei Jin, Yu‐Chao Li, Qing‐Long Wang et al.
Groundwater Monitoring & Remediation
Landfill Environmental Impact Studies
article

In Situ Monitoring Consolidation and Hardening Behaviors of an HDPE Geomembrane‐Cement‐Bentonite Composite Cutoff Wall

Zheng‐kai Wang, Wei Jin, Yu‐Chao Li, Qing‐Long Wang, Xiang‐Xian Dou
article en

Abstract

Abstract Vertical cutoff walls are commonly used for containment of contaminants and polluted groundwater. In this paper, an in situ multi‐parameter monitoring system that includes soil pressure, pore water pressure, and bulk electrical conductivity was installed in a 23.5‐m deep HDPE‐cement‐bentonite (HCB) cutoff wall, with the data collected from the first 20 d are presented herein. The shallow zone (≤2.5 m) became unsaturated after 2 d, triggering surface settlement, “CB mixture‐geomembrane” or “CB mixture‐trench sidewall” detachment, and shrinkage cracks; the intermediate zone (5–7.5 m) developed 80‐kPa suction on Day 4, while deeper responses lagged. Lateral pressure showed a V‐shaped trend, that is, initial hydration‐induced drop followed by a pressure increase due to bentonite swelling. Bulk electrical conductivity (3000–4000 mS/m) decreased overall but varied with the permeability of surrounding soil. The temperature evolution comprised three distinct stages: hydration heating, cooling, and stabilization.

Groundwater Monitoring & Remediation
Clean water and sanitation
Openalex Percentile: Top 64%
Landfill Environmental Impact Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

In Situ Monitoring Consolidation and Hardening Behaviors of an <scp>HDPE</scp> Geomembrane‐Cement‐Bentonite Composite Cutoff Wall — Zheng‐kai Wang, Wei Jin, et al. · Groundwater Monitoring & Remediation (2026) | TGRS Research Map | TGRS