Lot Scheduling to Minimize Makespan in Permutation Flowshop

This work investigates the permutation flowshop scheduling problem where each operation of any job is performed on a lot processing machine with uniform capacity. More than one job can be processed in the same lot, and the operations of all jobs in the lot are of the same completion time. Any job can be split and processed in consecutive lots, if necessary. The objective is to minimize the maximum completion time of the last operation of job, i.e., the makespan. We first examine the complexity of the considered problem, and provide a polynomial approximation algorithm when there are [Formula: see text] operations in the flowshop. We further explore three special cases with [Formula: see text] and present optimal solutions for each case, respectively. Moreover, we provide an [Formula: see text]-approximation algorithm for the situation where there are [Formula: see text] operations. Finally, the efficiency of the approximation algorithm is demonstrated via numerical experiments.

Authors

Institutions

Publication Details

Journal
Asia Pacific Journal of Operational Research
Published
2026-02-06
DOI
https://doi.org/10.1142/s0217595926500077
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Lot Scheduling to Minimize Makespan in Permutation Flowshop

Na Li, Feifeng Zheng, Ming Liu
Asia Pacific Journal of Operational Research
Scheduling and Optimization Algorithms
article

Lot Scheduling to Minimize Makespan in Permutation Flowshop

Na Li, Feifeng Zheng, Ming Liu
article en

Abstract

This work investigates the permutation flowshop scheduling problem where each operation of any job is performed on a lot processing machine with uniform capacity. More than one job can be processed in the same lot, and the operations of all jobs in the lot are of the same completion time. Any job can be split and processed in consecutive lots, if necessary. The objective is to minimize the maximum completion time of the last operation of job, i.e., the makespan. We first examine the complexity of the considered problem, and provide a polynomial approximation algorithm when there are [Formula: see text] operations in the flowshop. We further explore three special cases with [Formula: see text] and present optimal solutions for each case, respectively. Moreover, we provide an [Formula: see text]-approximation algorithm for the situation where there are [Formula: see text] operations. Finally, the efficiency of the approximation algorithm is demonstrated via numerical experiments.

Asia Pacific Journal of Operational Research
Tongji University (CN), Donghua University (CN), Shanghai Tongji Urban Planning and Design Institute (CN)
Decent work and economic growth
Openalex Percentile: Top 68%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Lot Scheduling to Minimize Makespan in Permutation Flowshop — Na Li, Feifeng Zheng, et al. · Asia Pacific Journal of Operational Research (2026) | TGRS Research Map | TGRS