Design–Build with a Development Phase: The Underlying Theory

This study focuses on a design–build (DB) procedure that exploits the related parties’ (preconstruction) collaboration to improve the economic efficiency of construction projects. It is called design–build with a development phase (DBd). In the procedure, the owner and the selected contractor continue the development of the project solution in cooperation, adhering to the principle of benefit sharing, which is enabled by preagreed rules and the benchmark solution, formed as a result of requirement-based price-inclusive contractor selection where technical design is not included in the proposal; the formation of the final contract is a two-stage process, and a new owner decision is needed to enter the realization phase. More precisely, this study aims to discover and formulate a theory that underlies the DBd procedure that is a heuristic construct of the procedure’s origin. For that, the DBd procedure was conceptualized by determining its key elements and their relationships, and by showing how a coherent whole is achieved by the elements’ mutual interoperability. Therefore, the study contributes to the body of knowledge by crystallizing the DBd concept and its rationality. Even more importantly, the study eventually establishes the novel DBd procedure by combining consistent theoretical and practical views considering the earlier success of DBd in trial projects.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2026-02-04
DOI
https://doi.org/10.1061/jcemd4.coeng-16826
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design–Build with a Development Phase: The Underlying Theory

Pertti Lahdenperä
Journal of Construction Engineering and Management
Construction Project Management and Performance
article

Design–Build with a Development Phase: The Underlying Theory

Pertti Lahdenperä
article en

Abstract

This study focuses on a design–build (DB) procedure that exploits the related parties’ (preconstruction) collaboration to improve the economic efficiency of construction projects. It is called design–build with a development phase (DBd). In the procedure, the owner and the selected contractor continue the development of the project solution in cooperation, adhering to the principle of benefit sharing, which is enabled by preagreed rules and the benchmark solution, formed as a result of requirement-based price-inclusive contractor selection where technical design is not included in the proposal; the formation of the final contract is a two-stage process, and a new owner decision is needed to enter the realization phase. More precisely, this study aims to discover and formulate a theory that underlies the DBd procedure that is a heuristic construct of the procedure’s origin. For that, the DBd procedure was conceptualized by determining its key elements and their relationships, and by showing how a coherent whole is achieved by the elements’ mutual interoperability. Therefore, the study contributes to the body of knowledge by crystallizing the DBd concept and its rationality. Even more importantly, the study eventually establishes the novel DBd procedure by combining consistent theoretical and practical views considering the earlier success of DBd in trial projects.

Journal of Construction Engineering and ManagementVol. 152(4)
VTT Technical Research Centre of Finland (FI)
Openalex Percentile: Top 70%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.