The Politics of Infrastructural Reversibility: No‐Regret Futures at the London Euston High‐Speed Railway Station

ABSTRACT Large infrastructure projects are difficult for publics to challenge, scrutinise, or engage with. A well‐researched barrier to public engagement is the technical complexity of large projects, whether it be materially present, or discursively constructed by professional experts. However, the multiple temporalities of large infrastructure projects can also hinder public scrutiny and opposition. In this commentary, I explore the reversibility of large infrastructure projects, using the example of the London Euston station expansion. This large project was launched in 2017 with the aim of preparing the central London railway station for high‐speed services. It has since been repeatedly paused, redesigned, and cancelled. Drawing on the London Euston case and theorisations of reversibility as the political act of extending the duration of the present, I discuss how reversibility was evoked and ‘made real’, and the challenges its ambiguity has presented in terms of public engagement. I end with the possibilities presented by the notion of infrastructural regrets and other emotional engagements with infrastructure in constructing just and inclusive urban futures.

Authors

Institutions

Publication Details

Journal
Geographical Journal
Published
2026-02-03
DOI
https://doi.org/10.1111/geoj.70066
Citations
1
Primary Topic
Urban Planning and Governance
Type
article
Field-Weighted Citation Impact
82.95
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Politics of Infrastructural Reversibility: No‐Regret Futures at the London Euston High‐Speed Railway Station

Anna Plyushteva
1 citations
Geographical Journal
Urban Planning and Governance
82.95
article

The Politics of Infrastructural Reversibility: No‐Regret Futures at the London Euston High‐Speed Railway Station

Anna Plyushteva
article en
1 citations

Abstract

ABSTRACT Large infrastructure projects are difficult for publics to challenge, scrutinise, or engage with. A well‐researched barrier to public engagement is the technical complexity of large projects, whether it be materially present, or discursively constructed by professional experts. However, the multiple temporalities of large infrastructure projects can also hinder public scrutiny and opposition. In this commentary, I explore the reversibility of large infrastructure projects, using the example of the London Euston station expansion. This large project was launched in 2017 with the aim of preparing the central London railway station for high‐speed services. It has since been repeatedly paused, redesigned, and cancelled. Drawing on the London Euston case and theorisations of reversibility as the political act of extending the duration of the present, I discuss how reversibility was evoked and ‘made real’, and the challenges its ambiguity has presented in terms of public engagement. I end with the possibilities presented by the notion of infrastructural regrets and other emotional engagements with infrastructure in constructing just and inclusive urban futures.

Geographical Journal
Department for Transport (GB)
Industry, innovation and infrastructure
Openalex Percentile: Top 0%
Urban Planning and Governance
82.95
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The Politics of Infrastructural Reversibility: No‐Regret Futures at the London Euston High‐Speed Railway Station — Anna Plyushteva · Geographical Journal (2026) | TGRS Research Map | TGRS