Forecasting and scheduling of railway rake

Coal transportation through railway rakes is essential to industry supply chains, but inefficient loading and unloading processes can lead to severe delays and expensive demurrage. By introducing a system to forecast and schedule railway rakes at coal terminals, this project seeks to eradicate such inefficiencies. The system will forecast key variables like rake arrival times, coal stocks, and site handling capacity from real-time inputs, predictive data, and sophisticated algorithms. Proactive decisions to avoid delays will be enabled. Real-time rake assignment will be optimized by a dynamic scheduling framework based on site constraints, dispatch priority, and rake type. This ensures better operations and less idle time. Next.js will be utilized in the system development to offer a scalable, efficient, and responsive web-based interface to handle forecasting and scheduling. Decreased rake turnaround time, increased throughput capacity, and a significant reduction in demurrage cost are the anticipated outcomes. This project promotes cost savings and more sustainable logistics management in the coal industry eradicating such inefficiencies.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2026-02-01
DOI
https://doi.org/10.1049/icp.2025.4779
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Forecasting and scheduling of railway rake

Sushma Nagdeote, Sujata Chiwande, Pradyumnaa Kadam, Rahul Gandla et al.
IET conference proceedings.
Mining Techniques and Economics
article

Forecasting and scheduling of railway rake

Sushma Nagdeote, Sujata Chiwande, Pradyumnaa Kadam, Rahul Gandla, Soham Khochare
article en

Abstract

Coal transportation through railway rakes is essential to industry supply chains, but inefficient loading and unloading processes can lead to severe delays and expensive demurrage. By introducing a system to forecast and schedule railway rakes at coal terminals, this project seeks to eradicate such inefficiencies. The system will forecast key variables like rake arrival times, coal stocks, and site handling capacity from real-time inputs, predictive data, and sophisticated algorithms. Proactive decisions to avoid delays will be enabled. Real-time rake assignment will be optimized by a dynamic scheduling framework based on site constraints, dispatch priority, and rake type. This ensures better operations and less idle time. Next.js will be utilized in the system development to offer a scalable, efficient, and responsive web-based interface to handle forecasting and scheduling. Decreased rake turnaround time, increased throughput capacity, and a significant reduction in demurrage cost are the anticipated outcomes. This project promotes cost savings and more sustainable logistics management in the coal industry eradicating such inefficiencies.

IET conference proceedings.Vol. 2025(43)
Global College (CY)
Industry, innovation and infrastructure
Openalex Percentile: Top 67%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.