A Novel Investment Risk Assessment Model for Complex Construction Projects Based on the IFA-LSSVM
The project cycle of complex construction projects covers the whole process from project decision-making, design, bidding, construction, completion acceptance, and the initial stage of operation. Among them, the investment risk assessment of complex construction projects focuses on the early decision-making stage of the project, aiming to provide a basis for investment feasibility analysis. The investment risk of complex construction projects is highly nonlinear and uncertain, and the traditional risk assessment methods have limitations in model generalization ability and prediction accuracy. To improve the accuracy and reliability of quantitative risk assessment, this study proposed a novel investment risk assessment model based on the perspective of investors. Firstly, through literature research, a multi-dimensional comprehensive risk assessment index system covering policies and regulations, economic environment, technical management, construction safety, and financial cost was systematically identified and constructed. Subsequently, the Least Squares Support Vector Machine (LSSVM) was used to establish a nonlinear mapping relationship between risk indicators and final risk levels. Aiming at the problem that the parameter selection of the standard LSSVM model has a significant impact on the performance, this paper proposed an improved Firefly Algorithm (IFA) to automatically optimize the penalty factor and kernel function parameters of LSSVM, so as to overcome the blindness of artificial parameter selection and improve the convergence speed and generalization ability of the model. Compared with the classical Firefly Algorithm, IFA strengthens learning and adaptive strategies by adding depth. The conclusions are as follows. (1) Compared with the Backpropagation Neural Network (BPNN), Random Forest (RF), and eXtreme Gradient Boosting (XGBoost), this model showed higher prediction accuracy on the test set, and its accuracy was reduced by about 3%. (2) Compared with FA, Genetic Algorithm (GA), and Particle Swarm Optimization (PSO), IFA had a stronger global retrieval ability. (3) The model could effectively fit the complex risk nonlinear relationship, and the risk assessment results were highly consistent with the actual situation. Therefore, the risk assessment model based on the improved LSSVM constructed in this study not only provides a more scientific and accurate quantitative tool for investment decision-making of construction projects, but also has important theoretical and practical significance for preventing and resolving significant investment risks.
Authors
- Rupeng Ren
- Shengmin Wang
- Jun Fang
Institutions
- Wuhan University of Technology (CN)
- Wuhan Textile University (CN)
Publication Details
- Journal
- Buildings
- Published
- 2026-02-02
- DOI
- https://doi.org/10.3390/buildings16030624
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00