A parallel test scheduling model for aero-engine altitude simulationtest facilities based on RCMPSP

<?A3B2 tlsb=-.02w?>The altitude simulation test facility is an essential testing infrastructure for developing advanced aero-engines. In recent years, the demand for altitude testing has surged continuously, leading to an increasingly prominent gap in testing capacity. Improving the efficiency of test scheduling has thus become a critical breakthrough direction. Operational research methods were innovatively applied by incorporating project management theory and resource-constrained multi-project scheduling problem (RCMPSP) theory to construct <?A3B2 tlsb?>a multi-cell parallel test scheduling model for altitude simulation test facilities. Through comparative calculations based on simulation data, the feasibility and superiority of the proposed scheduling model have been verified, demonstrating that the RCMPSP-based parallel test scheduling method holds significant potential for engineering application in the planning and scheduling of altitude simulation test facilities.

Authors

Publication Details

Journal
Ranqi wolun shiyan yu yanjiu.
Published
2026-02-01
DOI
https://doi.org/10.3724/j.gter.20250082
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A parallel test scheduling model for aero-engine altitude simulationtest facilities based on RCMPSP

Yehui WANG
Ranqi wolun shiyan yu yanjiu.
Resource-Constrained Project Scheduling
article

A parallel test scheduling model for aero-engine altitude simulationtest facilities based on RCMPSP

Yehui WANG
article en

Abstract

<?A3B2 tlsb=-.02w?>The altitude simulation test facility is an essential testing infrastructure for developing advanced aero-engines. In recent years, the demand for altitude testing has surged continuously, leading to an increasingly prominent gap in testing capacity. Improving the efficiency of test scheduling has thus become a critical breakthrough direction. Operational research methods were innovatively applied by incorporating project management theory and resource-constrained multi-project scheduling problem (RCMPSP) theory to construct <?A3B2 tlsb?>a multi-cell parallel test scheduling model for altitude simulation test facilities. Through comparative calculations based on simulation data, the feasibility and superiority of the proposed scheduling model have been verified, demonstrating that the RCMPSP-based parallel test scheduling method holds significant potential for engineering application in the planning and scheduling of altitude simulation test facilities.

Ranqi wolun shiyan yu yanjiu.Vol. 39(1)
Industry, innovation and infrastructure
Openalex Percentile: Top 73%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.