Risk analysis of PPP financing for toll road project

The Indonesian Government has limited funds to provide infrastructure facilities for its population of 261 million people, which requires an investment of US$ 6.445 trillion. Only 37% of this can be covered by government funds, necessitating the use of private funds for the remaining 63%. Public-Private Partnership (PPP) offer a solution for infrastructure development in Indonesia, where the government collaborates with the private sector to provide public infrastructure. However, PPP implementation faces challenges, such as changes in bank financial policies that affect financing schemes. The purpose of this study is to analyze the feasibility and variable risks of project funding through sensitivity analysis. A single case study approach was used to gather data. The results indicate that the Serang-Panimbang toll road project is feasible. Additionally, three parameters are identified as high risk: investment cost, income, and interest rate. The findings of this study are beneficial for the government and construction service actors involved in PPP projects. They also serve as a valuable literature review for academics studying PPPs.

Authors

Publication Details

Journal
Springer Link (Chiba Institute of Technology)
Published
2025-02-05
DOI
https://doi.org/10.1051/bioconf/202515902009/pdf
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk analysis of PPP financing for toll road project

Y.D. Suwandairi, Wahyu HJ, A. Suratkon, M. Amin et al.
Springer Link (Chiba Institute of Technology)
Public-Private Partnership Projects
article

Risk analysis of PPP financing for toll road project

Y.D. Suwandairi, Wahyu HJ, A. Suratkon, M. Amin, O.T. Tsarwan
article en

Abstract

The Indonesian Government has limited funds to provide infrastructure facilities for its population of 261 million people, which requires an investment of US$ 6.445 trillion. Only 37% of this can be covered by government funds, necessitating the use of private funds for the remaining 63%. Public-Private Partnership (PPP) offer a solution for infrastructure development in Indonesia, where the government collaborates with the private sector to provide public infrastructure. However, PPP implementation faces challenges, such as changes in bank financial policies that affect financing schemes. The purpose of this study is to analyze the feasibility and variable risks of project funding through sensitivity analysis. A single case study approach was used to gather data. The results indicate that the Serang-Panimbang toll road project is feasible. Additionally, three parameters are identified as high risk: investment cost, income, and interest rate. The findings of this study are beneficial for the government and construction service actors involved in PPP projects. They also serve as a valuable literature review for academics studying PPPs.

Springer Link (Chiba Institute of Technology)
Partnerships for the goals
Openalex Percentile: Top 19%
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.