AN ASSESSMENT OF EQUIPMENT PROCUREMENT AND MANAGEMENT POLICIES IN RADIOLOGY CENTRES IN NIGERIA

Background: A well organised equipment procurement and maintenance policy in radiology departments is critical for prompt and efficient health care delivery. Objective: To assess the equipment procurement and management policies in radiology departments in Nigeria with a view to finding the possible causes of frequent breakdown. Materials and methods: A survey was carried out in radiology departments of 13 Government Tertiary health care institutions. Ten Teaching and three Specialist Hospitals in South East, South West and North East of Nigeria were chosen for the study. One hundred and four (104) questionnaires of semi-structured type were distributed to the key players such as radiographers, who are the end users, hospital administrators, and hospital equipment engineers. The questionnaires sought to find out the procedure for equipment acquisition, the presence or absence of pre and post equipment certification, quality assurance program and planned preventive maintenance. Results: In most of the hospitals (11 of 13 hospitals) the radiographers were not involved in the course of planning, acquisition and delivery of the radiology equipments. It was also found out that only two of the hospitals had Quality Assurance program and none had Planned Preventive Maintenance programing place. Conclusion: There was absence of organized policy to involve the end users in the process of equipment procurement in most of the hospitals studied. Little presence of quality assurance program and complete absence of planned preventive maintenance were observed in all the hospitals. This may have accounted for the frequent breakdown, large numbers of unserviceable equipment and long down time when faults developed.

Authors

Institutions

Publication Details

Journal
JRRS
Published
2026-01-28
DOI
https://doi.org/10.82547/jrrs.vol26no1.118
Primary Topic
Quality and Safety in Healthcare
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

AN ASSESSMENT OF EQUIPMENT PROCUREMENT AND MANAGEMENT POLICIES IN RADIOLOGY CENTRES IN NIGERIA

Sobechukwu Onwuzu, Mark C. Okeji, Ebere Emilia Ayogu, Joseph C. Eze
JRRS
Quality and Safety in Healthcare
article

AN ASSESSMENT OF EQUIPMENT PROCUREMENT AND MANAGEMENT POLICIES IN RADIOLOGY CENTRES IN NIGERIA

Sobechukwu Onwuzu, Mark C. Okeji, Ebere Emilia Ayogu, Joseph C. Eze
article en

Abstract

Background: A well organised equipment procurement and maintenance policy in radiology departments is critical for prompt and efficient health care delivery. Objective: To assess the equipment procurement and management policies in radiology departments in Nigeria with a view to finding the possible causes of frequent breakdown. Materials and methods: A survey was carried out in radiology departments of 13 Government Tertiary health care institutions. Ten Teaching and three Specialist Hospitals in South East, South West and North East of Nigeria were chosen for the study. One hundred and four (104) questionnaires of semi-structured type were distributed to the key players such as radiographers, who are the end users, hospital administrators, and hospital equipment engineers. The questionnaires sought to find out the procedure for equipment acquisition, the presence or absence of pre and post equipment certification, quality assurance program and planned preventive maintenance. Results: In most of the hospitals (11 of 13 hospitals) the radiographers were not involved in the course of planning, acquisition and delivery of the radiology equipments. It was also found out that only two of the hospitals had Quality Assurance program and none had Planned Preventive Maintenance programing place. Conclusion: There was absence of organized policy to involve the end users in the process of equipment procurement in most of the hospitals studied. Little presence of quality assurance program and complete absence of planned preventive maintenance were observed in all the hospitals. This may have accounted for the frequent breakdown, large numbers of unserviceable equipment and long down time when faults developed.

JRRS
University of Nigeria (NG), Nnamdi Azikiwe University (NG), University of Nigeria Teaching Hospital (NG)
Partnerships for the goals
Openalex Percentile: Top 77%
Quality and Safety in Healthcare
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

AN ASSESSMENT OF EQUIPMENT PROCUREMENT AND MANAGEMENT POLICIES IN RADIOLOGY CENTRES IN NIGERIA — Sobechukwu Onwuzu, Mark C. Okeji, et al. · JRRS (2026) | TGRS Research Map | TGRS