The emergency DPR experience: water quality lessons from Wichita Falls, TX
ABSTRACT From 2011 to 2015, Wichita Falls, TX, faced a severe drought that dropped combined lake levels below 23%, prompting the city to implement an emergency direct potable reuse (DPR) system. The city proposed a plan to the Texas Commission on Environmental Quality (TCEQ) in 2012 to treat wastewater through existing advanced and conventional treatment plants. After constructing the necessary interconnections, two full-scale verification tests were conducted in 2014. Following TCEQ approval, the City operated the DPR treatment facility from 9 July 2014 through 21 July 2015. During its operation, more than 2 billion gallons (7.6 million cubic meters) of highly treated wastewater effluent were turned into potable water. After a historic rainfall event in May 2015, the system was decommissioned, having had no major incidents during its 377 days of full-scale operation. Wichita Falls' experience demonstrates the feasibility of large-scale potable reuse under emergency conditions and provides valuable operational and regulatory insights for utilities considering potable reuse implementation.
Authors
- Keisuke Ikehata (ORCID: https://orcid.org/0000-0001-9101-9775)
- Hunter Adams (ORCID: https://orcid.org/0000-0001-7288-208X)
- Greta Zornes
- Mark Southard (ORCID: https://orcid.org/0000-0001-8381-340X)
- Joshua Alexander Benjamin
- Daniel Nix
- David MacNevin
Institutions
- Texas State University (US)
- CDM Smith (United States) (US)
- Wichita Falls Independent School District (US)
- Oldham Council (GB)
- The University of Texas at Austin (US)
Publication Details
- Journal
- Water Reuse
- Published
- 2026-01-19
- DOI
- https://doi.org/10.2166/wrd.2026.103
- Primary Topic
- Wastewater Treatment and Reuse
- Type
- article
- Field-Weighted Citation Impact
- 0.00