Emergency Power Supply Restoration Strategy of Distribution Network Considering Operational Risk of Islanded Microgrid

This paper proposes an emergency power supply restoration strategy for a distribution network that considers the operational risk of an islanded microgrid in response to the issues of voltage exceeding limits and power imbalance faced during their operation. Firstly, a distribution network emergency power supply restoration model supported by a generalized dynamic islanded microgrid is constructed. By equating the alternate tie line with a virtual distributed generator (DG), the integrated power supply restoration problem of distribution network is transformed into a generalized island power distribution network division problem based on DGs. Then, the risk of islanded microgrid operation is considered and restricted by chance constraints. Finally, simulation results based on the improved IEEE-33 node distribution network show that, compared to the generalized island partitioning strategy which ignores operational risks, the proposed strategy increases the power supply restoration rate from 83.4% to 97.8% while successfully ensuring the stability of all islanded microgrids under the specified confidence level for operational risk.

Authors

Institutions

Publication Details

Journal
Processes
Published
2026-01-29
DOI
https://doi.org/10.3390/pr14030480
Primary Topic
Optimal Power Flow Distribution
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Emergency Power Supply Restoration Strategy of Distribution Network Considering Operational Risk of Islanded Microgrid

Qian Ai, Juan Zuo, Wenbo Wang, Chongxin Xu et al.
Processes
Optimal Power Flow Distribution
article

Emergency Power Supply Restoration Strategy of Distribution Network Considering Operational Risk of Islanded Microgrid

Qian Ai, Juan Zuo, Wenbo Wang, Chongxin Xu, Yihui Luo
article en

Abstract

This paper proposes an emergency power supply restoration strategy for a distribution network that considers the operational risk of an islanded microgrid in response to the issues of voltage exceeding limits and power imbalance faced during their operation. Firstly, a distribution network emergency power supply restoration model supported by a generalized dynamic islanded microgrid is constructed. By equating the alternate tie line with a virtual distributed generator (DG), the integrated power supply restoration problem of distribution network is transformed into a generalized island power distribution network division problem based on DGs. Then, the risk of islanded microgrid operation is considered and restricted by chance constraints. Finally, simulation results based on the improved IEEE-33 node distribution network show that, compared to the generalized island partitioning strategy which ignores operational risks, the proposed strategy increases the power supply restoration rate from 83.4% to 97.8% while successfully ensuring the stability of all islanded microgrids under the specified confidence level for operational risk.

ProcessesVol. 14(3)
Shanghai Jiao Tong University (CN), Southeast University (CN)
Openalex Percentile: Top 73%
Optimal Power Flow Distribution
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Emergency Power Supply Restoration Strategy of Distribution Network Considering Operational Risk of Islanded Microgrid — Qian Ai, Juan Zuo, et al. · Processes (2026) | TGRS Research Map | TGRS