A beam chopping scheme concept for the new LAMP MEBT

As part of the LANSCE Accelerator Modernization Project (LAMP), the two existing 750-keV Cockcroft Waltons are planned to be replaced by a single radio-frequency quadrupole (RFQ). The new LAMP front-end needs to deliver beams with similar timing patterns to what is currently delivered to the multiple target stations. To accomplish this, the 3-MeV Medium Energy Beam Transport (MEBT) is designed with two choppers that help produce beam timing patterns required by the experimental user facilities. The new RFQ will introduce satellite bunches around the single high-intensity bunch that is required by the users. These satellite bunches need to be removed in the MEBT. This contribution describes the design of LAMP MEBT with a beam chopping scheme and presents simulation results.

Authors

Publication Details

Journal
JACOW
Published
2026-01-29
DOI
https://doi.org/10.18429/jacow-napac2025-tup002
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A beam chopping scheme concept for the new LAMP MEBT

Haoran Xu, Salvador Sosa Güitrón, Lawrence Rybarcyk, K. Bishofberger et al.
JACOW
Particle accelerators and beam dynamics
article

A beam chopping scheme concept for the new LAMP MEBT

Haoran Xu, Salvador Sosa Güitrón, Lawrence Rybarcyk, K. Bishofberger, Gregory Dale, Mr. Janardan Prasad Upadhyay, Dimitre Dimitrov, John Lewellen, Sergey Kurennoy, Dmitry Gorelov
article en

Abstract

As part of the LANSCE Accelerator Modernization Project (LAMP), the two existing 750-keV Cockcroft Waltons are planned to be replaced by a single radio-frequency quadrupole (RFQ). The new LAMP front-end needs to deliver beams with similar timing patterns to what is currently delivered to the multiple target stations. To accomplish this, the 3-MeV Medium Energy Beam Transport (MEBT) is designed with two choppers that help produce beam timing patterns required by the experimental user facilities. The new RFQ will introduce satellite bunches around the single high-intensity bunch that is required by the users. These satellite bunches need to be removed in the MEBT. This contribution describes the design of LAMP MEBT with a beam chopping scheme and presents simulation results.

JACOW
Affordable and clean energy
Openalex Percentile: Top 74%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.