Radioisotope production at the Spallation Neutron Source: Design concept of isotope production target

Upon completion of the Second Target Station (STS) Project in the mid 2030s, the Spallation Neutron Source accelerator at Oak Ridge National Laboratory will deliver a 2.7 MW proton beam to the neutron production targets. In the post-STS phase, the accelerator will have a reserve beam power capacity of at least 100 kW beyond what the two neutron production targets will receive, which could potentially be ramped up to 300 kW. In this paper, a design concept for a radioisotope production target that could utilize 250 kW of the reserve beam power capacity is presented. The target consists of thorium discs encapsulated in 316L austenitic steel shells that are cooled by water. The estimated post-irradiation activity of Ac-225 and Ra-225, critical medical radioisotopes used in targeted alpha therapy cancer treatment, is calculated at the end of bombardment after a 14 day long irradiation time. Thermal and structural analyses are performed on the basis of calculated nuclear heating data. The technical feasibility of a high-power target under a 250-kW beam load with an extremely low duty factor of 3.5 × 10^-6 is presented from thermal, structural and fatigue lifetime perspectives.

Authors

Publication Details

Journal
JACOW
Published
2026-01-29
DOI
https://doi.org/10.18429/jacow-napac2025-thp066
Primary Topic
Boron Compounds in Chemistry
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Radioisotope production at the Spallation Neutron Source: Design concept of isotope production target

Justin Griswold, M. P. Stöckli, Yong Joong Lee, Sang-Ho Kim
JACOW
Boron Compounds in Chemistry
article

Radioisotope production at the Spallation Neutron Source: Design concept of isotope production target

Justin Griswold, M. P. Stöckli, Yong Joong Lee, Sang-Ho Kim
article en

Abstract

Upon completion of the Second Target Station (STS) Project in the mid 2030s, the Spallation Neutron Source accelerator at Oak Ridge National Laboratory will deliver a 2.7 MW proton beam to the neutron production targets. In the post-STS phase, the accelerator will have a reserve beam power capacity of at least 100 kW beyond what the two neutron production targets will receive, which could potentially be ramped up to 300 kW. In this paper, a design concept for a radioisotope production target that could utilize 250 kW of the reserve beam power capacity is presented. The target consists of thorium discs encapsulated in 316L austenitic steel shells that are cooled by water. The estimated post-irradiation activity of Ac-225 and Ra-225, critical medical radioisotopes used in targeted alpha therapy cancer treatment, is calculated at the end of bombardment after a 14 day long irradiation time. Thermal and structural analyses are performed on the basis of calculated nuclear heating data. The technical feasibility of a high-power target under a 250-kW beam load with an extremely low duty factor of 3.5 × 10^-6 is presented from thermal, structural and fatigue lifetime perspectives.

JACOW
Openalex Percentile: Top 74%
Boron Compounds in Chemistry
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Radioisotope production at the Spallation Neutron Source: Design concept of isotope production target — Justin Griswold, M. P. Stöckli, et al. · JACOW (2026) | TGRS Research Map | TGRS