Mitigating transition in the Fermilab Booster using a triple phase jump

The PIP-II project currently under construction will boost neutrino production for DUNE, Fermilab's flagship long baseline neutrino oscillation experiment, by doubling the beam power delivered by the accelerator complex. To accomplish this, the total charge injected from the linac into the existing Booster RCS ring will increase from 4.5 to 6.5E12 while the machine ramp rate will be raised from 15 to 20 Hz. The Booster accelerates beam from 800 to 8000 MeV and crosses transition at γ = 5.45 In current, pre PIP-II operations, no formal gamma-t jump system is used and the longitudinal emittance blowup is limited with an active quadrupole mode feedback system. Due to the slip-stacking process used in the dowstream Recycler Ring to accumulate and increase bunch intensity, to prevent excessive particle loss the longitudinal emittance at extraction limited is set to 0.1 eV-s (95%). Given that collective fields scale with intensity, it is anticipated that additional measures will need to be put in place to meet this requirement. We look at the so-called triple phase-jump technique a possible candidates for transition mitigation and present some simulation results. Despite known limitations, attractive aspects of the triple jump are that the phase manipulations are incorporated within the digital LLRF system; no additional magnets or pulsed power supplies are needed and the technique is compatible with active quadrupole mode feedback.

Authors

Publication Details

Journal
JACOW
Published
2026-01-29
DOI
https://doi.org/10.18429/jacow-napac2025-thp054
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mitigating transition in the Fermilab Booster using a triple phase jump

Jean-Francois Ostiguy, Chandrashekhara Bhat
JACOW
Particle accelerators and beam dynamics
article

Mitigating transition in the Fermilab Booster using a triple phase jump

Jean-Francois Ostiguy, Chandrashekhara Bhat
article en

Abstract

The PIP-II project currently under construction will boost neutrino production for DUNE, Fermilab's flagship long baseline neutrino oscillation experiment, by doubling the beam power delivered by the accelerator complex. To accomplish this, the total charge injected from the linac into the existing Booster RCS ring will increase from 4.5 to 6.5E12 while the machine ramp rate will be raised from 15 to 20 Hz. The Booster accelerates beam from 800 to 8000 MeV and crosses transition at γ = 5.45 In current, pre PIP-II operations, no formal gamma-t jump system is used and the longitudinal emittance blowup is limited with an active quadrupole mode feedback system. Due to the slip-stacking process used in the dowstream Recycler Ring to accumulate and increase bunch intensity, to prevent excessive particle loss the longitudinal emittance at extraction limited is set to 0.1 eV-s (95%). Given that collective fields scale with intensity, it is anticipated that additional measures will need to be put in place to meet this requirement. We look at the so-called triple phase-jump technique a possible candidates for transition mitigation and present some simulation results. Despite known limitations, attractive aspects of the triple jump are that the phase manipulations are incorporated within the digital LLRF system; no additional magnets or pulsed power supplies are needed and the technique is compatible with active quadrupole mode feedback.

JACOW
Openalex Percentile: Top 75%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Mitigating transition in the Fermilab Booster using a triple phase jump — Jean-Francois Ostiguy, Chandrashekhara Bhat · JACOW (2026) | TGRS Research Map | TGRS