Watts the Problem? Digital Redlining and the Hidden Energy Crisis Lyon Township Never Knew It Approved
In September 2025, Lyon Township, Michigan approved a massive data center through an industrial zoning exemption that required no public hearings, no community votes, and no disclosure of actual energy consumption. Residents learned about the approval three months later through Facebook posts. This case study examines how technology infrastructure concentration operates through regulatory loopholes in rural communities using regulatory loopholes to bypass notice. The facility approved—Project Flex—will consume 8.3 trillion watt-hours of electricity annually, equivalent to the total consumption of entire Michigan counties with populations exceeding 190,000 residents. It will extract 912 billion gallons of water yearly---approximately 260 times Flint's entire municipal water system (3.5 billion gallons annually). It will generate 4.2 million metric tons of carbon dioxide annually, equivalent to 913,000 vehicles driving continuously. All of this was approved without community knowledge, consent, or negotiation. This research documents how digital redlining operates through infrastructure concentration in rural communities, using Lyon Township's experience to reveal the systematic pattern of placing massive technological burdens in places without institutional capacity to resist.
Authors
- Mario De Sean Booker
Institutions
- Purdue University West Lafayette (US)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2025-12-31
- DOI
- https://doi.org/10.5281/zenodo.18412296
- Primary Topic
- Water-Energy-Food Nexus Studies
- Type
- article
- Field-Weighted Citation Impact
- 0.00