Start-to-end simulations of the LAMP accelerator front-end

The LANSCE Accelerator Modernization Project (LAMP) plans to replace the two existing 750-keV Cockcroft Waltons by a single radio-frequency quadrupole (RFQ), and to install a new 100-MeV drift-tube linac (DTL). LAMP will simultaneously produce H+ and H- beams with different timing patterns to serve multiple experimental facilities. A low energy beam transport (LEBT) is designed to transport H+ and H- beams from the ion sources into the 201.25 MHz RFQ, where the beams are accelerated to 3 MeV. A medium energy beam transport (MEBT) is designed to transport the beam from the RFQ to the DTL. The DTL accelerates both beams to 100 MeV. The LEBT and MEBT designs include beam choppers and rf systems that imprint the multiple timing patterns required by experiments. Here we describe a concept of the LAMP front-end and present particle simulation results for multiple beams relevant to the facility.

Authors

Publication Details

Journal
JACOW
Published
2026-01-29
DOI
https://doi.org/10.18429/jacow-napac2025-tup087
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Start-to-end simulations of the LAMP accelerator front-end

Haoran Xu, Salvador Sosa Güitrón, Lawrence Rybarcyk, K. Bishofberger et al.
JACOW
Particle accelerators and beam dynamics
article

Start-to-end simulations of the LAMP accelerator front-end

Haoran Xu, Salvador Sosa Güitrón, Lawrence Rybarcyk, K. Bishofberger, Gregory Dale, Mr. Janardan Prasad Upadhyay, Dimitre Dimitrov, John Lewellen, Sergey Kurennoy, Dmitry Gorelov
article en

Abstract

The LANSCE Accelerator Modernization Project (LAMP) plans to replace the two existing 750-keV Cockcroft Waltons by a single radio-frequency quadrupole (RFQ), and to install a new 100-MeV drift-tube linac (DTL). LAMP will simultaneously produce H+ and H- beams with different timing patterns to serve multiple experimental facilities. A low energy beam transport (LEBT) is designed to transport H+ and H- beams from the ion sources into the 201.25 MHz RFQ, where the beams are accelerated to 3 MeV. A medium energy beam transport (MEBT) is designed to transport the beam from the RFQ to the DTL. The DTL accelerates both beams to 100 MeV. The LEBT and MEBT designs include beam choppers and rf systems that imprint the multiple timing patterns required by experiments. Here we describe a concept of the LAMP front-end and present particle simulation results for multiple beams relevant to the facility.

JACOW
Affordable and clean energy
Openalex Percentile: Top 75%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Start-to-end simulations of the LAMP accelerator front-end — Haoran Xu, Salvador Sosa Güitrón, et al. · JACOW (2026) | TGRS Research Map | TGRS