A hybrid fuzzy cognitive–system dynamics framework for modeling environmental risk evolution in construction megaprojects

Emphasizing the critical role of sustainability, this research comprehensively assesses environmental risks in industrial-construction megaprojects and shows that identifying and managing these risks can help reduce negative environmental consequences and improve sustainable decision-making. The present study aims to analyze the environmental risk management system in a megaproject as a case. Therefore, the innovation of this research lies in the use of a system dynamics approach and fuzzy cognitive mapping to identify and assess environmental risks in large-scale industrial and civil engineering projects. Based on this analysis, each aspect of a project's environmental risk management is ranked using the Analytic Network Process (ANP), and Decision Making Trial and Evaluation Laboratory (DEMATEL) and causal relationships are examined. Also, using the Fuzzy Cognitive Map (FCM) approach, the in degree, out degree, and centrality of each risk have been identified. Then, the behavioral model is determined based on the system dynamics. The risk of completing the project timely and the issues related to the increase in time due to environmental laws were ranked first, an over predicted increase in the project time due to environmental laws was ranked second, and the factor of environmental issues and problems was ranked third. Environmental issues and problems have the highest impact and the risk of completing the project timely and the issues related to the increase in time due to environmental laws were the most affected factor. Experts believe that the involvement of several institutions and decision-making from the perspective of environmental climate issues is one of the most significant environmental risks affecting the completion of the project. This issue is because the risk of completing the project timely from an environmental perspective and environmental issues and problems is reduced by controlling and reducing this risk. These two risks are increasing with an increase in the risk of conflict among several decision-making institutions from the perspective of environmental climate issues. The risk of the involvement of several decision-making institutions from a climate and environmental perspective is directly associated with two risks of environmental issues and problems and the risk of completing the project timely. Thus, the institutions involved in the climate and environmental issues of the project can reduce the risk of timely completion of the project and environmental issues and problems with mechanisms and memorandums that reduce the risk of conflict among them.

Authors

Institutions

Publication Details

Journal
OICC Press Journals
Published
2025-11-07
DOI
https://doi.org/10.57647/j.fomj.2025.0604.19
Primary Topic
Cognitive Science and Mapping
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A hybrid fuzzy cognitive–system dynamics framework for modeling environmental risk evolution in construction megaprojects

Alireza Mirjalili, Abolfazl Sadeghian, Seyed Amin Seyedi, Mahoudreza Maheri
OICC Press Journals
Cognitive Science and Mapping
article

A hybrid fuzzy cognitive–system dynamics framework for modeling environmental risk evolution in construction megaprojects

Alireza Mirjalili, Abolfazl Sadeghian, Seyed Amin Seyedi, Mahoudreza Maheri
article en

Abstract

Emphasizing the critical role of sustainability, this research comprehensively assesses environmental risks in industrial-construction megaprojects and shows that identifying and managing these risks can help reduce negative environmental consequences and improve sustainable decision-making. The present study aims to analyze the environmental risk management system in a megaproject as a case. Therefore, the innovation of this research lies in the use of a system dynamics approach and fuzzy cognitive mapping to identify and assess environmental risks in large-scale industrial and civil engineering projects. Based on this analysis, each aspect of a project's environmental risk management is ranked using the Analytic Network Process (ANP), and Decision Making Trial and Evaluation Laboratory (DEMATEL) and causal relationships are examined. Also, using the Fuzzy Cognitive Map (FCM) approach, the in degree, out degree, and centrality of each risk have been identified. Then, the behavioral model is determined based on the system dynamics. The risk of completing the project timely and the issues related to the increase in time due to environmental laws were ranked first, an over predicted increase in the project time due to environmental laws was ranked second, and the factor of environmental issues and problems was ranked third. Environmental issues and problems have the highest impact and the risk of completing the project timely and the issues related to the increase in time due to environmental laws were the most affected factor. Experts believe that the involvement of several institutions and decision-making from the perspective of environmental climate issues is one of the most significant environmental risks affecting the completion of the project. This issue is because the risk of completing the project timely from an environmental perspective and environmental issues and problems is reduced by controlling and reducing this risk. These two risks are increasing with an increase in the risk of conflict among several decision-making institutions from the perspective of environmental climate issues. The risk of the involvement of several decision-making institutions from a climate and environmental perspective is directly associated with two risks of environmental issues and problems and the risk of completing the project timely. Thus, the institutions involved in the climate and environmental issues of the project can reduce the risk of timely completion of the project and environmental issues and problems with mechanisms and memorandums that reduce the risk of conflict among them.

OICC Press Journals
Shiraz University (IR), Islamic Azad University, Yazd (IR)
Openalex Percentile: Top 15%
Cognitive Science and Mapping
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.