Proposing a quantitative index to measure the industrialisation level of building projects

The industrialisation of construction has been the subject of numerous studies that aim to enhance efficiency, sustainability and quality in this sector. The existing systems for measuring the level of industrialisation in building projects involve qualitative approaches such as classifications by levels, or quantitative ones based on cost sharing. These models, however, are usually static and do not take into consideration the influence of each work unit within the project, which reduces its applicability in specific contexts. This study develops a quantitative and adaptable methodology for evaluating an industrialisation level index in construction projects, taking into account key factors such as the proportion of the work completed in the factory and on site, the economic importance of each work unit and its contribution to the overall sustainability of the project. The proposed model makes it possible to distinguish the true impact of industrialisation more accurately, avoiding the limitations of generalised approaches. The methodology enables industrialised solutions to be integrated more accurately into rehabilitation projects and new builds, providing an objective tool for strategic decision-making in construction. The system proposed improves on the existing models by offering a dynamic and adaptable evaluation, adjusting the industrialisation rate of each work unit according to its importance within the project. The methodology represents a significant improvement in the measurement of industrialisation in construction, providing a more accurate reference framework for optimising building processes. The Industrialisation Level Index (ILI) ranged from 0.05 to 0.80 across 14 test cases, demonstrating its ability to capture a wide variety of industrialisation levels. The tool supports strategic decisions in selecting industrialised construction systems for cost and time efficiency.

Authors

Publication Details

Journal
UPM Digital Archive (Technical University of Madrid)
Published
2025-09-01
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Proposing a quantitative index to measure the industrialisation level of building projects

Alfonso Cobo Escamilla, José Antonio Tenorio Ríos, Guillermo Sotorrio Ortega
UPM Digital Archive (Technical University of Madrid)
BIM and Construction Integration
article

Proposing a quantitative index to measure the industrialisation level of building projects

Alfonso Cobo Escamilla, José Antonio Tenorio Ríos, Guillermo Sotorrio Ortega
article en

Abstract

The industrialisation of construction has been the subject of numerous studies that aim to enhance efficiency, sustainability and quality in this sector. The existing systems for measuring the level of industrialisation in building projects involve qualitative approaches such as classifications by levels, or quantitative ones based on cost sharing. These models, however, are usually static and do not take into consideration the influence of each work unit within the project, which reduces its applicability in specific contexts. This study develops a quantitative and adaptable methodology for evaluating an industrialisation level index in construction projects, taking into account key factors such as the proportion of the work completed in the factory and on site, the economic importance of each work unit and its contribution to the overall sustainability of the project. The proposed model makes it possible to distinguish the true impact of industrialisation more accurately, avoiding the limitations of generalised approaches. The methodology enables industrialised solutions to be integrated more accurately into rehabilitation projects and new builds, providing an objective tool for strategic decision-making in construction. The system proposed improves on the existing models by offering a dynamic and adaptable evaluation, adjusting the industrialisation rate of each work unit according to its importance within the project. The methodology represents a significant improvement in the measurement of industrialisation in construction, providing a more accurate reference framework for optimising building processes. The Industrialisation Level Index (ILI) ranged from 0.05 to 0.80 across 14 test cases, demonstrating its ability to capture a wide variety of industrialisation levels. The tool supports strategic decisions in selecting industrialised construction systems for cost and time efficiency.

UPM Digital Archive (Technical University of Madrid)
Industry, innovation and infrastructure
Openalex Percentile: Top 34%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.