Modeling a Reliable Intermodal Routing Problem for Emergency Materials in the Early Stage of Post-Disaster Recovery Under Uncertainty of Demand and Capacity

This study investigates an intermodal routing problem for emergency materials in the early stage of post-disaster recovery, in which the rapid transportation of emergency materials is formulated as the objective. To achieve reliable transportation that can avoid transportation interruption, this study formulates the uncertainty of both emergency materials’ demand and the network capacity by LR triangular fuzzy numbers, and thus explores a reliable routing problem for transporting emergency materials that is further formulated by a fuzzy linear programming model. Considering the decision makers’ cautious attitude on the transportation of emergency materials to avoid transportation interruption, this study adopts chance-constrained programming based on necessity measure to build a solvable reformulation of the proposed model. A numerical case study is carried out to reveal the conflicting relationship between improving the reliability and reducing the time of transporting emergency materials. The decision-makers of the emergency materials transportation organization should select a reasonable confidence level based on the actual decision-making scenario to plan the reliable intermodal route for emergency materials. By comparing with deterministic modeling, this study verifies the feasibility of the modeling the uncertainty of both demand and capacity in avoiding unreliable transportation and enhancing the flexibility of the intermodal routing for emergency materials. By comparing with chance-constrained programming using possibility measure, this study demonstrates the feasibility of the necessity measure in planning the reliable intermodal route. This study further analyzes how the capacity level of the intermodal network, demand level of the emergency materials and stability of the LR triangular fuzzy parameters influence the optimization results. Accordingly, this study emphasizes the importance of objectively evaluating the uncertain demand for emergency materials, and reveals that the enhancement of the capacity level of the intermodal network and stability of LR triangular fuzzy parameters is able to reduce the transportation time of emergency materials and meanwhile maintain a high reliability.

Authors

Institutions

Publication Details

Journal
Applied System Innovation
Published
2026-01-23
DOI
https://doi.org/10.3390/asi9020027
Citations
1
Primary Topic
Facility Location and Emergency Management
Type
article
Field-Weighted Citation Impact
63.80

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Modeling a Reliable Intermodal Routing Problem for Emergency Materials in the Early Stage of Post-Disaster Recovery Under Uncertainty of Demand and Capacity

Yu Huang, Yan Sun, Yue Lu, Haochu Cui
1 citations
Applied System Innovation
Facility Location and Emergency Management
63.80
article

Modeling a Reliable Intermodal Routing Problem for Emergency Materials in the Early Stage of Post-Disaster Recovery Under Uncertainty of Demand and Capacity

Yu Huang, Yan Sun, Yue Lu, Haochu Cui
article en
1 citations

Abstract

This study investigates an intermodal routing problem for emergency materials in the early stage of post-disaster recovery, in which the rapid transportation of emergency materials is formulated as the objective. To achieve reliable transportation that can avoid transportation interruption, this study formulates the uncertainty of both emergency materials’ demand and the network capacity by LR triangular fuzzy numbers, and thus explores a reliable routing problem for transporting emergency materials that is further formulated by a fuzzy linear programming model. Considering the decision makers’ cautious attitude on the transportation of emergency materials to avoid transportation interruption, this study adopts chance-constrained programming based on necessity measure to build a solvable reformulation of the proposed model. A numerical case study is carried out to reveal the conflicting relationship between improving the reliability and reducing the time of transporting emergency materials. The decision-makers of the emergency materials transportation organization should select a reasonable confidence level based on the actual decision-making scenario to plan the reliable intermodal route for emergency materials. By comparing with deterministic modeling, this study verifies the feasibility of the modeling the uncertainty of both demand and capacity in avoiding unreliable transportation and enhancing the flexibility of the intermodal routing for emergency materials. By comparing with chance-constrained programming using possibility measure, this study demonstrates the feasibility of the necessity measure in planning the reliable intermodal route. This study further analyzes how the capacity level of the intermodal network, demand level of the emergency materials and stability of the LR triangular fuzzy parameters influence the optimization results. Accordingly, this study emphasizes the importance of objectively evaluating the uncertain demand for emergency materials, and reveals that the enhancement of the capacity level of the intermodal network and stability of LR triangular fuzzy parameters is able to reduce the transportation time of emergency materials and meanwhile maintain a high reliability.

Applied System InnovationVol. 9(2)
National Development and Reform Commission (CN), University of Jinan (CN), Shandong University of Finance and Economics (CN)
National Natural Science Foundation of China, Natural Science Foundation of Shandong Province
Climate action
Openalex Percentile: Top 1%
Facility Location and Emergency Management
63.80
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.