MEP Facility Planning for Achieving a Zero-Energy Building in a Research Institution
This study outlines MEP planning and HVAC design for a zero-energy research facility. The building integrates renewable systems: a groundwater heat exchanger, biomass CHP using gasified wood, 200 kW of photovoltaics, and 4,600 kWh battery storage for potential off-grid operation. Passive architectural strategies reduce thermal loads, while the ABW-based interior offers flexible environments. The HVAC system uses occupant-centric control, adjusting outdoor air volume by real-time occupancy and maintaining surface temperature uniformity via radiant panels. Three types of low-power personal air conditioning devices, smartphone-controlled and integrated into ceilings and desks, provide personalized comfort. This holistic approach supports energy neutrality and enhances occupant well-being..
Authors
- Daisuke Hatori
- Atsushi Takamuku
- Kentaro Kimura (ORCID: https://orcid.org/0000-0002-3193-1524)
- Yuka Mutoh
- Shin-ichi Tanabe
Publication Details
- Journal
- Springer Link (Chiba Institute of Technology)
- Published
- 2026-01-21
- DOI
- https://doi.org/10.1051/e3sconf/202668902005/pdf
- Primary Topic
- Building Energy and Comfort Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00