Weather-related delays in Vietnamese building projects: a quantitative and comparative analysis

Weather-related delays are a significant challenge in construction projects, particularly in countries like Vietnam, where weather conditions are increasingly unpredictable. This study aims to develop a predictive model to estimate construction schedule delays caused by abnormal weather conditions during the dry and rainy seasons. An eight-step research framework was employed, combining historical meteorological data and records from 15 completed construction projects. Expert evaluations identified extreme temperature and precipitation as the primary causes of delay. Using regression analysis, the study developed two reliable seasonal delay prediction models, achieving R² values of 80.2% for the dry season and 96.0% for the rainy season. Monte Carlo simulations were conducted to assess uncertainty in the forecast, indicating estimated delay probabilities of 84.3% during the dry season and 69.8% during the rainy season. The findings confirm that adverse weather significantly affects project timelines, especially during the structural construction phase. The proposed model provides a practical tool for construction managers to anticipate and mitigate the impacts of inclement weather on project schedules.

Authors

Institutions

Publication Details

Journal
Discover Civil Engineering
Published
2026-01-21
DOI
https://doi.org/10.1007/s44290-026-00411-3
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Weather-related delays in Vietnamese building projects: a quantitative and comparative analysis

Hà Duy Khánh
Discover Civil Engineering
Construction Project Management and Performance
article

Weather-related delays in Vietnamese building projects: a quantitative and comparative analysis

Hà Duy Khánh
article en

Abstract

Weather-related delays are a significant challenge in construction projects, particularly in countries like Vietnam, where weather conditions are increasingly unpredictable. This study aims to develop a predictive model to estimate construction schedule delays caused by abnormal weather conditions during the dry and rainy seasons. An eight-step research framework was employed, combining historical meteorological data and records from 15 completed construction projects. Expert evaluations identified extreme temperature and precipitation as the primary causes of delay. Using regression analysis, the study developed two reliable seasonal delay prediction models, achieving R² values of 80.2% for the dry season and 96.0% for the rainy season. Monte Carlo simulations were conducted to assess uncertainty in the forecast, indicating estimated delay probabilities of 84.3% during the dry season and 69.8% during the rainy season. The findings confirm that adverse weather significantly affects project timelines, especially during the structural construction phase. The proposed model provides a practical tool for construction managers to anticipate and mitigate the impacts of inclement weather on project schedules.

Discover Civil EngineeringVol. 3(1)
Ho Chi Minh City University of Technology and Engineering (VN)
Openalex Percentile: Top 84%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.