First beam commissioning experience with RF system on chip based bunch by bunch signal processing systems at SLS 2.0 at SLS 2.0

After a dark time of 15 months, the new diffraction limited storage ring SLS 2.0 had first beam in January 2025. In April 2025, the nominal beam current of 400 mA was reached. In this contribution, we present the status and first beam commissioning experience with the RF System-on-Chip (RFSoC) based signal processing systems of the new SLS 2.0 ring. RFSoCs integrate several fast multi-GSample/s ADCs and DACs, FPGA (programmable logic) fabric and multi-core CPUs all on the same chip. During SLS 2.0 commissioning, the integrated EPICS IOC of the RFSoCs provided bunch-by-bunch diagnostics of dedicated BPM position and charge readings. Integrated DACs are driving newly developed transverse and longitudinal kicker magnets, enabling bunch-by-bunch excitation and damping. Bidirectional multi-Gigabit fiber optic links connect the RFSoC to the event system master, thus enabling both synchronisation of the RFSoC to the event system, as well as real-time control of the event system master by the RFSoCs, e.g. for control of beam injection timing and filling pattern.

Authors

Publication Details

Journal
JACOW
Published
2026-01-20
DOI
https://doi.org/10.18429/jacow-ibic2025-mopco12
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

First beam commissioning experience with RF system on chip based bunch by bunch signal processing systems at SLS 2.0 at SLS 2.0

B. Keil, Pedro Baeta Neves Diniz Santos, Goran Marinkovic
JACOW
Particle Accelerators and Free-Electron Lasers
article

First beam commissioning experience with RF system on chip based bunch by bunch signal processing systems at SLS 2.0 at SLS 2.0

B. Keil, Pedro Baeta Neves Diniz Santos, Goran Marinkovic
article en

Abstract

After a dark time of 15 months, the new diffraction limited storage ring SLS 2.0 had first beam in January 2025. In April 2025, the nominal beam current of 400 mA was reached. In this contribution, we present the status and first beam commissioning experience with the RF System-on-Chip (RFSoC) based signal processing systems of the new SLS 2.0 ring. RFSoCs integrate several fast multi-GSample/s ADCs and DACs, FPGA (programmable logic) fabric and multi-core CPUs all on the same chip. During SLS 2.0 commissioning, the integrated EPICS IOC of the RFSoCs provided bunch-by-bunch diagnostics of dedicated BPM position and charge readings. Integrated DACs are driving newly developed transverse and longitudinal kicker magnets, enabling bunch-by-bunch excitation and damping. Bidirectional multi-Gigabit fiber optic links connect the RFSoC to the event system master, thus enabling both synchronisation of the RFSoC to the event system, as well as real-time control of the event system master by the RFSoCs, e.g. for control of beam injection timing and filling pattern.

JACOW
Openalex Percentile: Top 82%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

First beam commissioning experience with RF system on chip based bunch by bunch signal processing systems at SLS 2.0 at SLS 2.0 — B. Keil, Pedro Baeta Neves Diniz Santos, et al. · JACOW (2026) | TGRS Research Map | TGRS