Fast beam-based alignment of BPMs and quadrupole magnets for SPring-8-II

In modern low-emittance electron storage rings, precise beam orbit control is crucial to ensure the beam passes through the magnetic center of each high-gradient multipole magnet, with an accuracy of 10 μm or even better. Accurate alignment of a BPM with the center of the neighboring magnet is imperative, a critical requirement for SPring-8-II. With a total of 340 BPMs, efficient beam commissioning of SPring-8-II necessitates a fast beam-based alignment (BBA) method. To assess the feasibility of this method, we conducted a fast BBA experiment at the current SPring-8 storage ring utilizing new BPM readout electronics based on MicroTCA.4, enabling a data acquisition rate at 10 kHz. We varied the strength of a quadrupole magnet adjacent to a BPM head connected to the new fast readout. We scanned the electron beam across the quadrupole center by adjusting a steering dipole magnet. The BPM offset from the quadrupole center was then determined by analyzing data from all BPMs connected to the fast readout. This contribution will detail the proposed fast BBA procedure for SPring-8-II and present the results obtained from the feasibility test at the existing SPring-8 storage ring.

Authors

Publication Details

Journal
JACOW
Published
2026-01-20
DOI
https://doi.org/10.18429/jacow-ibic2025-wepco07
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Fast beam-based alignment of BPMs and quadrupole magnets for SPring-8-II

Mitsuhiro Masaki, Hirokazu Maesaka, Hideki Dewa, S. Takano
JACOW
Particle Accelerators and Free-Electron Lasers
article

Fast beam-based alignment of BPMs and quadrupole magnets for SPring-8-II

Mitsuhiro Masaki, Hirokazu Maesaka, Hideki Dewa, S. Takano
article en

Abstract

In modern low-emittance electron storage rings, precise beam orbit control is crucial to ensure the beam passes through the magnetic center of each high-gradient multipole magnet, with an accuracy of 10 μm or even better. Accurate alignment of a BPM with the center of the neighboring magnet is imperative, a critical requirement for SPring-8-II. With a total of 340 BPMs, efficient beam commissioning of SPring-8-II necessitates a fast beam-based alignment (BBA) method. To assess the feasibility of this method, we conducted a fast BBA experiment at the current SPring-8 storage ring utilizing new BPM readout electronics based on MicroTCA.4, enabling a data acquisition rate at 10 kHz. We varied the strength of a quadrupole magnet adjacent to a BPM head connected to the new fast readout. We scanned the electron beam across the quadrupole center by adjusting a steering dipole magnet. The BPM offset from the quadrupole center was then determined by analyzing data from all BPMs connected to the fast readout. This contribution will detail the proposed fast BBA procedure for SPring-8-II and present the results obtained from the feasibility test at the existing SPring-8 storage ring.

JACOW
Affordable and clean energy
Openalex Percentile: Top 82%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.