Experiments on a BSM test bench for CSNS-II linac upgrade

A test bench for commissioning the 324 MHz RF deflectors used in BSMs has been in use for the upgrade project CSNS-II linac. The pulsed 10keV electron beam produced by a Kimball focusable electron gun has been captured by a YAG:Ce screen and imaged by an industrial camera installed vertically right above the view port of the screen after passing through the body of the RF deflector undertest. This paper introduces the verificating experiments of static electric lens, RF deflections and bending magnet, also with the postprocessing of the beam spot images. Results of theoretical analysis and the tests were compared and agreed very well. The experiments verified the feasibility of the BSM test bench, playing a critical role in shortening the future commissioning time of BSM equipment in the tunnel.

Authors

Publication Details

Journal
JACOW
Published
2026-01-20
DOI
https://doi.org/10.18429/jacow-ibic2025-wepco21
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Experiments on a BSM test bench for CSNS-II linac upgrade

Nie Xiaojun, Junhao Wei, QR Liu, Weiling Huang et al.
JACOW
Particle Accelerators and Free-Electron Lasers
article

Experiments on a BSM test bench for CSNS-II linac upgrade

Nie Xiaojun, Junhao Wei, QR Liu, Weiling Huang, Zhihong Xu, Renjun Yang, Yanfeng Sui, Fang Li, B Tan, Y. L. Wang, Ruiyang Qiu, Lei Zeng, J liang, Xiaoyu Liu, Xu Yang, Muhammad Abdul Rehman
article en

Abstract

A test bench for commissioning the 324 MHz RF deflectors used in BSMs has been in use for the upgrade project CSNS-II linac. The pulsed 10keV electron beam produced by a Kimball focusable electron gun has been captured by a YAG:Ce screen and imaged by an industrial camera installed vertically right above the view port of the screen after passing through the body of the RF deflector undertest. This paper introduces the verificating experiments of static electric lens, RF deflections and bending magnet, also with the postprocessing of the beam spot images. Results of theoretical analysis and the tests were compared and agreed very well. The experiments verified the feasibility of the BSM test bench, playing a critical role in shortening the future commissioning time of BSM equipment in the tunnel.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 83%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.